Weider Pro 9940 English Manual - Page 14
Nylon Locknut 68. - cables
View all Weider Pro 9940 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
28. Wrap the Ab Cable (74) around a 3 1/2" Pulley (24) in 28 the direction shown. Slide the Pulley and a Cable Trap (25) onto the 3/8" x 3 1/2" Carriage Bolt (95) already inserted into the Butterfly Base (4). Secure the Pulley with a 3/8" Nylon Jamnut (63). Make sure the Cable Trap is oriented as shown. Route the threaded end of the Ab Cable (74) under the 3 1/2" Pulley (24) that is already mounted on the Weight Base (5). Make sure the Cable is routed in the direction shown. 4 Note: For clarity, this and the following drawings show some parts removed. 29. Wrap the Ab Cable (74) around a 4 1/2" Pulley (82) in 29 the direction shown. Attach the Pulley inside the indicated bracket on the Weight Top Frame (66) with a 3/8" x 1 3/4" Bolt (57) and a 3/8" Nylon Locknut (50). Make sure the threaded end of the Ab Cable is routed through the bracket, as shown. 30. Attach the threaded end of the Ab Cable (74) to a "U"Bracket (97) with a 1/4" Flat Washer (71) and a 1/4" 30 Nylon Locknut (68). Attach the "U"-Bracket (97) to the hole in the Short Weight Tube (17) with a 5/16" x 1 3/4" Bolt (96) and a 5/16" Nylon Locknut (64). Note: Do not completely tighten the Nylon Locknut; it should be threaded only two turns onto the end of the Cable, as shown in the inset drawing. 63 24 74 25 95 24 5 50 Bracket 74 End of Cable 82 57 66 74 71 68 97 74 64 97 96 71 68 17 14