Yamaha MLC-200 MLC-200 Installation Guide - Page 23
Final operation check
View all Yamaha MLC-200 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
10. Final operation check After installing the MLA-200s onto instruments and setting up the devices, reconnect the cables, and then perform the final operation check. The procedure for this operation check is the same as that described in "8. Operation check" (Page 18), but this time the operation is checked after setting up the system in the classroom. 10-1. Check that the MLA-200 for the instructor as well as audio devices, such as the microphone or CD player, can be operated from ML Touch. 10-2. Check the communication between ML Touch and the MLA-200s for students. This completes the final operation check. MLC-200 Installation Guide - 23
MLC-200 Installation Guide
–
23
10. Final operation check
After installing the MLA-200s onto instruments and setting up the devices, reconnect the cables, and then perform the
final operation check.
The procedure for this operation check is the same as that described in “8. Operation check” (Page 18), but this time the
operation is checked after setting up the system in the classroom.
10-1. Check that the MLA-200 for the instructor as well as audio devices,
such as the microphone or CD player, can be operated from ML Touch.
10-2. Check the communication between ML Touch and the MLA-200s for students.
This completes the final operation check.