Adaptec FS4500 User Guide - Page 20

Installation Checklist, Step 1: Preparing for Installation - review

Page 20 highlights

Installing the Storage Enclosure Installation Checklist For a smooth and trouble-free installation, thoroughly review this chapter and perform the tasks in the order shown here: 1 Plan and prepare for installation. See page 2-2. 2 Install the enclosure in a rack or tower assembly (optional.) See page 2-3. 3 Install the drive carriers. See page 2-9. 4 Connect the AC power cords to the APC modules. See page 2-13. 5 Connect the I/O cables. See page 2-9. 6 Go to the chapter for your specific Storage Enclosure interface. See Next Steps on page 2-13. Step 1: Preparing for Installation ! Caution: Before touching any of the Storage Enclosure components, ground yourself and take antistatic precautions. Adaptec recommends that you use an antistatic wrist strap and a grounding wire as a minimum precaution. Remove all of the components from the packaging and place them on an antistatic surface until you are ready to use them. If you are using new disk drives, place them so they acclimate to room temperature before you install them in the enclosure and power on the system. Before continuing, inspect the components for shipping damage. Ensure that you have the tools you require for rack or tower assembly installation: ■ Phillips-head screwdriver ■ Wrench for tightening nuts (if your rack does not have threaded holes) 2-2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91

2-2
Installing the Storage Enclosure
Installation Checklist
For a smooth and trouble-free installation, thoroughly review this
chapter and perform the tasks in the order shown here:
1
Plan and prepare for installation. See
page 2-2
.
2
Install the enclosure in a rack or tower assembly (
optional
.) See
page 2-3
.
3
Install the drive carriers. See
page 2-9
.
4
Connect the AC power cords to the APC modules. See
page 2-13
.
5
Connect the I/O cables. See
page 2-9
.
6
Go to the chapter for your specific Storage Enclosure interface.
See
Next Steps
on page 2-13
.
Step 1: Preparing for Installation
Caution:
Before touching any of the Storage Enclosure
components, ground yourself and take antistatic precautions.
Adaptec recommends that you use an antistatic wrist strap
and a grounding wire as a minimum precaution.
Remove all of the components from the packaging and place them
on an antistatic surface until you are ready to use them. If you are
using new disk drives, place them so they acclimate to room
temperature before you install them in the enclosure and power on
the system.
Before continuing, inspect the components for shipping damage.
Ensure that you have the tools you require for rack or tower
assembly installation:
Phillips-head screwdriver
Wrench for tightening nuts (if your rack does not have threaded
holes)
!