Alpine CDE 102 Cde-102 Owner′s Manual (english) - Page 28

Installation

Page 28 highlights

Installation Detachable Front Panel Caution When you install this unit in your car, do not remove the detachable front panel. If the detachable front panel is removed during installation, you might press too hard and warp the metal plate that holds it in place. • The main unit must be mounted within 35 degrees of the horizontal plane, back to front. Less than 35° 1 Mounting Sleeve (Included) Dashboard Reinforce the head unit with the metal mounting strap (not supplied). Secure the ground lead of the unit to a clean metal spot using a screw (*1) already attached to the vehicle's chassis. • For the screw marked "*2", use an appropriate screw for the chosen mounting location. Connect each input lead coming from an amplifier to the corresponding output lead coming from the left rear of the CDE-102. Connect all other leads of the CDE-102 according to details described in the CONNECTlONS section. 3 Slide the CDE-102 into the dashboard until it clicks. This ensures that the unit is properly locked and will not accidentally come out from the dashboard. Install the detachable front panel. Removal 1. Remove the detachable front panel. 2. Insert the bracket keys into the unit, along the guides on either side. The unit can now be removed from the mounting sleeve. This unit Bracket Keys (Included) 3. Pull the unit out, keeping it unlocked as you do so. Pressure Plates* This unit * If the installed mounting sleeve is loose in the dashboard, the pressure plates may be bent slightly to remedy the problem. Remove the mounting sleeve from the main unit (see "Removal" on page 26). 2 Screw Hex Nut (M5) Metal Mounting Strap Ground Lead *2 Bolt Stud *1 Chassis This unit Front Frame This unit Ground Lead *3 Screws (M5 × 8) (Included) Mounting Bracket Secure the ground lead of the unit to a clean metal spot using a screw (*3) already attached to the vehicle's chassis. 26-EN

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31

26
-EN
Installation
The main unit must be mounted within 35 degrees of the horizontal
plane, back to front.
Removal
1. Remove the detachable front panel.
2. Insert the bracket keys into the unit, along the guides
on either side. The unit can now be removed from the
mounting sleeve.
3. Pull the unit out, keeping it unlocked as you do so.
<JAPANESE CAR>
Secure the ground lead of the unit to a clean metal spot using a screw
(*
3
) already attached to the vehicle’s chassis.
Caution
When you install this unit in your car, do not remove the
detachable front panel.
If the detachable front panel is removed during installation, you
might press too hard and warp the metal plate that holds it in
place.
1
*
If the installed mounting sleeve is loose in the dashboard, the
pressure plates may be bent slightly to remedy the problem.
Remove the mounting sleeve from the main unit (see
“Removal” on page 26).
2
Detachable Front
Panel
Less than 35°
Mounting Sleeve
(Included)
Dashboard
This unit
Pressure Plates
*
Metal
Mounting
Strap
Chassis
Hex Nut (M5)
Bolt Stud
Ground Lead
Screw
This unit
*
2
*
1
Reinforce the head unit with the metal mounting
strap (not supplied). Secure the ground lead of the
unit to a clean metal spot using a screw (
*
1
) already
attached to the vehicle’s chassis.
For the screw marked “*
2
”, use an appropriate screw for the chosen
mounting location.
Connect each input lead coming from an amplifier to
the corresponding output lead coming from the left
rear of the CDE-102. Connect all other leads of the
CDE-102 according to details described in the
CONNECTlONS section.
3
Slide the CDE-102 into the dashboard until it clicks.
This ensures that the unit is properly locked and will
not accidentally come out from the dashboard.
Install the detachable front panel.
Bracket Keys
(Included)
This unit
Front Frame
This unit
Screws (M5 × 8)
(Included)
Mounting Bracket
Ground Lead
*
3