Cisco 3750G-12S Hardware Installation Guide - Page 115
Four Twisted-Pair Cable Pinouts for 10/100 Ports
UPC - 746320812526
View all Cisco 3750G-12S manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 115 highlights
Appendix B Connector and Cable Specifications Cable and Adapter Specifications Four Twisted-Pair Cable Pinouts for 10/100 Ports Figure B-9 and Figure B-10 show the schematics of four twisted-pair cables for 10/100/1000 ports. Figure B-9 Switch 1 TPO+ 2 TPO3 TP1+ 6 TP1- Four Twisted-Pair Straight-Through Cable Schematic for 10/100/1000 Ports Router or PC 1 TP1+ 2 TP13 TPO+ 6 TPO- 4 TP2+ 5 TP27 TP3+ 8 TP3- 4 TP3+ 5 TP37 TP2+ 8 TP2- 65272 Figure B-10 Switch 1 TP0+ 2 TP03 TP1+ 6 TP1- 4 TP2+ 5 TP27 TP3+ 8 TP3- 65274 Four Twisted-Pair Crossover Cable Schematic for 10/100/1000 Ports Switch 1 TP0+ 2 TP03 TP1+ 6 TP1- 4 TP2+ 5 TP27 TP3+ 8 TP3- OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide B-7
B-7
Catalyst 3750 Switch Hardware Installation Guide
OL-6336-10
Appendix B
Connector and Cable Specifications
Cable and Adapter Specifications
Four Twisted-Pair Cable Pinouts for 10/100 Ports
Figure B-9
and
Figure B-10
show the schematics of four twisted-pair cables for 10/100/1000 ports.
Figure B-9
Four Twisted-Pair Straight-Through Cable Schematic for 10/100/1000 Ports
Figure B-10
Four Twisted-Pair Crossover Cable Schematic for 10/100/1000 Ports
1
TPO+
2
TPO-
3
TP1+
6
TP1-
1
TP1+
Switch
Router or PC
2
TP1-
3
TPO+
6
TPO-
4
TP2+
5
TP2-
7
TP3+
8
TP3-
4
TP3+
5
TP3-
7
TP2+
8
TP2-
65272
1 TP0+
2 TP0-
3 TP1+
6 TP1-
1 TP0+
Switch
Switch
2 TP0-
3 TP1+
6 TP1-
4 TP2+
5 TP2-
7 TP3+
8 TP3-
4 TP2+
5 TP2-
7 TP3+
8 TP3-
65274