Cisco 3750G-12S Hardware Installation Guide - Page 67

Mounting the Switch on a Wall

Page 67 highlights

Chapter 2 Switch Installation Installing the Switch Mounting the Switch on a Wall For the best support of the switch and cables, make sure the switch is attached securely to wall studs or to a firmly attached plywood-mounting backboard. Mount the switch with the front panel facing up, as shown in Figure 2-43. See the "Wall-Mounting" section on page 2-27 for the switches that can also mount with the front panel facing down. Warning Read the wall-mounting instructions carefully before beginning installation. Failure to use the correct hardware or to follow the correct procedures could result in a hazardous situation to people and damage to the system. Statement 378 Figure 2-43 Mounting the Switch on a Wall Catalyst 3750 SERIES 24X 23X 24 22 23 20 21 18 19 14X 16 17 14 15 13X 13 12X 11X 10 11 12 1X 2X 8 9 67 45 23 1 MODE STASCPKEDEUDPSLTXAMTASRTPRSSYST 1 1 86570 1 User-supplied screws After the switch is mounted on the wall, you might need to perform these tasks to complete the installation, run the setup program, and access the switch: • (Optional) Connect the switches in the stacks. See the "Connecting StackWise Cable to StackWise Ports" section on page 2-30. • Power on the switch. See the "Verifying Switch Operation" section on page 2-7. If the switches are stacked, see the "Planning Considerations" section on page 2-8 for information on powering considerations. • Connect to a 10/100 or 10/100/1000 port and run Express Setup. See the Catalyst 3750 Switch Getting Started Guide for instructions. OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide 2-29

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146

2-29
Catalyst 3750 Switch Hardware Installation Guide
OL-6336-10
Chapter 2
Switch Installation
Installing the Switch
Mounting the Switch on a Wall
For the best support of the switch and cables, make sure the switch is attached securely to wall studs or
to a firmly attached plywood-mounting backboard. Mount the switch with the front panel facing up, as
shown in
Figure 2-43
.
See the
“Wall-Mounting” section on page 2-27
for the switches that can also mount with the front panel
facing down.
Warning
Read the wall-mounting instructions carefully before beginning installation. Failure to use the
correct hardware or to follow the correct procedures could result in a hazardous situation to people
and damage to the system.
Statement 378
Figure 2-43
Mounting the Switch on a Wall
After the switch is mounted on the wall, you might need to perform these tasks to complete the
installation, run the setup program, and access the switch:
(Optional) Connect the switches in the stacks. See the
“Connecting StackWise Cable to StackWise
Ports” section on page 2-30
.
Power on the switch. See the
“Verifying Switch Operation” section on page 2-7
. If the switches are
stacked, see the
“Planning Considerations” section on page 2-8
for information on powering
considerations.
Connect to a 10/100 or 10/100/1000 port and run Express Setup. See the
Catalyst 3750 Switch
Getting Started Guide
for instructions.
1
User-supplied screws
Catalyst 3750
SERIES
SYST
RPS
MASTR
STAT
DUPLX
SPEED
STACK
MODE
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
1
1
86570