Cisco 3750G-12S Hardware Installation Guide - Page 39
Switch Installation, Preparing for Installation - 16td
UPC - 746320812526
View all Cisco 3750G-12S manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 39 highlights
Switch Installation 2 C H A P T E R This chapter describes how to start your switch and how to interpret the power-on self-test (POST) that ensures proper operation. It describes the planning and cabling considerations to keep in mind while planning your stack. It describes how to install the switch and make connections to the switch. Read the topics and perform the procedures in this order: • Preparing for Installation, page 2-1 • Verifying Switch Operation, page 2-7 • Planning the Stack, page 2-8 • Installing the Switch, page 2-11 • Connecting StackWise Cable to StackWise Ports, page 2-30 • Installing and Removing SFP Modules, page 2-33 • Installing and Removing XENPAK Modules (Catalyst 3750G-16TD Switch), page 2-35 • Connecting to the 10/100 and 10/100/1000 Ports, page 2-39 • Connecting to an SFP Module, page 2-41 • Connecting to a XENPAK Module, page 2-44 • Where to Go Next, page 2-45 Preparing for Installation This section covers these topics: • Warnings, page 2-2 • Installation Guidelines, page 2-6 • Box Contents, page 2-7 • Tools and Equipment, page 2-7 OL-6336-10 Catalyst 3750 Switch Hardware Installation Guide 2-1