Cub Cadet 3X 30 inch HD Operation Manual - Page 14

E-Z Chute Control™, Set-Up

Page 14 highlights

5. Insert other end of chute control rod into coupler below handle panel. Make sure to line up flat end of rod and flat end of coupler. You may need to rotate rod around until these two surfaces line up. See Figure 2-46 inset. E-Z Chute Control™ Figure 2-46 6. Push chute control rod toward the control panel until hole in rod lines up with middle hole in chute control input and insert cotter pin (a) removed in Step 1. See Figure 2-47. (a) Figure 2-47 NOTE: There is a reference hole provided at rear end of control rod to help know when holes are vertical. NOTE: Hole furthest from chute control head is used to achieve further engagement of chute control rod into coupler if required. Refer to Service section for Chute Control Rod adjustment on page 25. Hole closest to chute control head is used for manual movement of chute assembly if required. Refer to Controls & Operation section on page 18. STOP Continue to Set-Up (page 14) The E-Z Chute™ does not require any installation. Figure 2-48 STOP Continue to Set-Up (page 14) Set-Up Chute Control Cable Routing (If Equipped) For units equipped with 2-way or 4-way chute control joystick, electric chute control and/or chute-pitch controls, ensure control cables are routed properly. Chute control cables are routed through a single wire guide (a) on top of the engine and/ or through two wire guides (b) located on the left side of the unit. NOTE: For smoothest operation, cables should all be to the left of the chute directional control rod. NOTE: The number of cables routed through the wire guides will depend on unit model. 1. Locate cable guide(s) and perform the following: • Units with Top Mounted Wire Guide (a) Check that all cables are properly routed through cable guide on top of engine. See Figure 2-49. • Units with Side Mounted Wire Guides (b) - Check that all cables are properly routed through the wire guide below the left side of the engine and the wire guide below the chute control head. See Figure 2-49. (c) (a) (c) (b) Figure 2-49 14 Section 2 - Assembly & Set-Up

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

14
S
ECTION
2 — A
SSEMBLY
& S
ET
-U
P
5.
Insert other end of chute control rod
into coupler below handle panel. Make
sure to line up flat end of rod and flat
end of coupler. You may need to rotate
rod around until these two surfaces line
up. See Figure 2-46 inset.
Figure 2-46
6.
Push chute control rod toward the
control panel until hole in rod lines up
with middle hole in chute control input
and insert cotter pin (a) removed in
Step 1. See Figure 2-47.
(a)
Figure 2-47
NOTE:
There is a reference hole
provided at rear end of control rod to
help know when holes are vertical.
NOTE:
Hole furthest from chute
control head is used to achieve
further engagement of chute control
rod into coupler if required. Refer to
Service section for Chute Control Rod
adjustment on page 25.
Hole closest to chute control head is
used for manual movement of chute
assembly if required. Refer to Controls &
Operation section on page 18.
STOP
Continue to Set-Up (page 14)
E-Z Chute Control™
Figure 2-48
STOP
Continue to Set-Up (page 14)
Set-Up
Chute Control Cable Routing (If
Equipped)
For units equipped with 2-way or 4-way chute
control joystick, electric chute control and/or
chute-pitch controls, ensure control cables are
routed properly.
Chute control cables are routed through a
single wire guide (a) on top of the engine and/
or through two wire guides (b) located on the
left side of the unit.
NOTE:
For smoothest operation, cables should
all be to the left of the chute directional control
rod.
NOTE:
The number of cables routed through
the wire guides will depend on unit model.
1.
Locate cable guide(s) and perform the
following:
Units with Top Mounted Wire Guide (a) -
Check that all cables are properly routed
through cable guide on top of engine.
See Figure 2-49.
Units with Side Mounted Wire Guides
(b) -
Check that all cables are properly
routed through the wire guide below
the left side of the engine and the wire
guide
below the chute control head.
See Figure 2-49.
(b)
(a)
(c)
(c)
Figure 2-49
The E-Z Chute™ does not require any
installation.