Dell Powerconnect W-ClearPass Hardware Appliances W-CP500 Hardware Installatio - Page 8

Unpacking the 4-Post Rack Installation Assemblies

Page 8 highlights

5. Unpacking the 4-Post Rack Installation Assemblies Before you begin verify the ship kit includes one of the following installation assemblies: • One power cord • Installation hardware (shown below) • The 4-post and/or 2-post rack rail and bracket assemblies 4-POST RACK INSTALLATION HARDWARE Ten (10) M6 x 6 Phillips Head Screws Ten (10) Rack Clips 2-POST RACK INSTALLATION HARDWARE Eight (8) M5 x 12 Flat Head Screws Eight (8) M5 x 12 Cone Washers Front view Side view Front Side Rear BOTH RACKS INSTALLATION HARDWARE Twenty-two (22) M4 x 4 Truss Head Screws Front view Side view Front view Side view Side view NOTE: Use the hardware supplied with your specific rack if different from the hardware supplied in this kit. The appliance rack mounting components consist of two sections common to both rack types: • A set of adjustable outer fixed rack rail assemblies that attach directly to the rack(s). • A set of inner fixed chassis rail that attach to the appliance (these must be removed from each of the adjustable rack rail assemblies). NOTE: See Step 1 in Section 6A on page 8 or Step 1 in Section 6B on page 9 to see these rack assemblies. The 4-post rack assembly consists of: • A set of long, fixed rack brackets (A). • A set of short, fixed rack brackets (B). NOTE: See Section 6A on the page 8 of this document for the rack bracket assemblies A and B. The 2-post rack assembly consists of: • A set of long, fixed rack brackets (A). • Two sets of short rack brackets (B and C). Set (C) has threaded holes (for placement in the front) to allow the appliance to be secured in the rack. NOTE: See Section 6B on page 9 of this document for rack assemblies A, B and C. W-ClearPass 500 Hardware Installation Guide 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13

W-ClearPass 500 Hardware Installation Guide
8
5.
Unpacking the 4-Post Rack Installation Assemblies
Before you begin verify the ship kit includes one of the following installation assemblies:
One power cord
Installation hardware (shown below)
The 4-post and/or 2-post rack rail and bracket assemblies
4-POST RACK INSTALLATION HARDWARE
2-POST RACK INSTALLATION HARDWARE
Ten
(10)
M6 x 6
Phillips Head Screws
Ten
(10)
Rack Clips
Eight
(8)
M5 x 12
Flat Head Screws
Eight
(8)
M5 x 12
Cone Washers
Front view
Side view
Fr
ont
Side
Rear
Front view
Side view
Side view
BOTH RACKS INSTALLATION
HARDW
ARE
Twenty-two
(22)
M4 x 4
Truss Head Screws
Front view
Side view
The appliance rack mounting components consist of two sections common to both rack types:
A set of adjustable outer fixed rack rail assemblies that attach directly to the rack(s).
A set of inner fixed chassis rail that attach to the appliance (these must be removed from each of the
adjustable rack rail assemblies).
NOTE:
See Step 1 in Section 6A on page 8 or Step 1 in Section 6B on page 9 to see these rack assemblies.
The 4-post rack assembly consists of:
A set of long, fixed rack brackets (
A
).
A set of short, fixed rack brackets (
B
).
NOTE:
See Section 6A on the page 8 of this document for the rack bracket assemblies A and B.
The 2-post rack assembly consists of:
A set of long, fixed rack brackets (
A
).
Two sets of short rack brackets (
B
and
C
). Set (
C
) has threaded holes (for placement in the front) to allow
the appliance to be secured in the rack.
NOTE:
See Section 6B on page 9 of this document for rack assemblies A, B and C
.
NOTE:
Use the hardware supplied with your
specific
rack if different from the hardware
supplied in this
kit.