Dell Powerconnect W-ClearPass Hardware Appliances W-CP500 Hardware Installatio - Page 9

A. 4-Post Rack Installation

Page 9 highlights

6A. 4-Post Rack Installation Unpack the appliance and locate the mounting hardware Step 1 • Remove the inner fixed chassis rails from the outer fixed chassis rails. • Pull each one out as far as possible. • Depress the locking tab to pull the inner rail completely out. • Put these rails aside for later installation on the appliance. Step 2 • Attach the long (A) and short (B) brackets to the outer fixed chassis rails as shown, using the shorter ones in the front and the longer ones in the rear. • Leave approximately one inch of space between the front end of the shorter bracket and the outer fixed chassis rail in the front. The two vertical holes in the front brackets align with the threaded holes in the front of the rails. • Secure with four M4 x 4 screws, two in the front and two in the rear on each side. Step 3 Rack Clip Installation: A. In the front, install three rack clips through each of three holes of the rack as shown. B. In the back, install two rack clips in the top and bottom of three holes that are level in height with the front rack clip installation. This will ensure for proper alignment when installing the assembled rack rail components to the rack. NOTE: The tabs on each rack clip should be on the top and bottom to help stabilize the final installation process. No tools are needed to install the rack clips. Firmly press them into place. Step 4 Rack Clip Installation: B. In the front, insert and tighten two M6 x 6* screws through the top and bottom holes of the assembled rack rail components into the rack clips as shown leaving the center hole empty for later use to secure the appliance in the rack. D. In the rear, insert and tighten two M6 x 6* screws through the top and bottom holes of the assembled rack components into the rack clips as shown. The center holes in the rear will remain empty. * NOTE: Use the hardware supplied with your specific rack if different from the hardware supplied in this kit. Once you have completed mounting the brackets and outer fixed chassis rails to the 4-post rack, proceed to Section 7 on page 10, Rail Installation on the Appliance. W-ClearPass 500 Hardware Installation Guide 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13

W-ClearPass 500 Hardware Installation Guide
9
6A. 4-Post Rack Installation
Unpack the appliance and locate the mounting hardware
Step 1
Remove the inner fixed chassis rails from the outer fixed chassis
rails.
Pull each one out as far as possible.
Depress the locking tab to pull the inner rail completely out.
Put these rails aside for later installation on the appliance.
Step 2
Attach the long (
A
) and short (
B
) brackets to the outer fixed chassis
rails as shown, using the shorter ones in the front and the longer ones
in the rear.
Leave approximately one inch of space between the front end of the
shorter bracket and the outer fixed chassis rail in the front. The two
vertical holes in the front brackets align with the threaded holes in the
front of the rails.
Secure with four M4 x 4 screws, two in the front and two in the rear
on each side.
Step 3
Rack Clip Installation:
A.
In the front, install three rack clips through each
of three holes of the rack as shown.
B.
In the back, install two rack clips in the top and
bottom of three holes that are level in height with the
front rack clip installation. This will ensure for
proper alignment when installing the assembled
rack rail components to the rack.
NOTE:
The tabs on each rack clip should be on the top and
bottom to help stabilize the final installation process. No
tools are needed to install the rack clips. Firmly press them
into place.
Step 4
Rack Clip Installation:
B.
In the front, insert and tighten two M6 x 6
*
screws through the
top and bottom holes of the assembled rack rail components into
the rack clips as shown leaving the center hole empty for later use
to secure the appliance in the rack.
D.
In the rear, insert and tighten two M6 x 6
*
screws through the top and bottom holes
of the assembled rack components into the rack clips as shown. The center holes in
the rear will remain empty.
Once you have completed mounting the brackets and outer fixed chassis rails to the 4-post rack,
proceed to
Section 7
on page 10,
Rail Installation on the Appliance.
NOTE:
Use the hardware
supplied with your
specific
rack if different from the
hardware supplied in this
kit.
*