Dell S5212F-ON EMC PowerSwitch S5200F-ON Series Installation Guide February 20 - Page 31
One-half U switch removal, One U ReadyRails installation
View all Dell S5212F-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 31 highlights
2. Insert the second switch in the open dual-tray slot if you are installing two switches. The switch is fully inserted when it presses the stop features on the dual tray. The front switch latch snaps the switch into place. Close-up view of the stop at the back of the switch. One-half U switch removal Remove the S5212F-ON switch using the following instructions: NOTE: To remove the S5232F-ON, S5248F-ON, S5296F-ON, or S5224F-ON switch, see One U ReadyRails installation. To remove the S5296F-ON switch, see Two U four-post rack assembly. Push in the front switch latches according to the latch arrows and pull out the switch. One U ReadyRails installation S5224F-ON, S5248F-ON, and S5232F-ON switches, you can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post flush mount, two-post center mount, or four-post threaded mount. S5200F-ON Series switch installation 31