E-Z-GO 2Five Owner Manual - Page 88
Wheel Installation, sequence' pattern.
View all E-Z-GO 2Five manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 88 highlights
MAINTENANCE PROCEDURES Read all of this manual to become thoroughly familiar with this vehicle. Pay particular attention to all Notices, Cautions, Warnings, and Dangers. Wheel Installation To reduce the possibility of component damage, do not tighten lug nuts to more than 85 ft. lbs. (115 Nm) torque. Valve Stem Cap It is important to follow the 'cross sequence' pattern when installing lug nuts. This will assure even seating of the wheel against the hub. With the valve stem to the outside, mount the wheel onto the hub with lug nuts. Finger tighten the lug nuts (1) in a 'cross sequence' pattern. Tighten the lug nuts to 50 to 85 ft. lbs. (68 to 115 Nm) torque in 20 ft. lbs. (27 Nm) increments following the 'cross sequence' pattern. 1 Tire style may vary Cross Sequence 80 2Five Owner's Guide