Fluke N4K 2PP42I Product Manual - Page 28
Taking Inventory, Installation and Switching On, Installation, Switching Device
View all Fluke N4K 2PP42I manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 28 highlights
4 Startup Taking Inventory Taking Inventory Before you work with the analyzer, check the delivery to ensure that it is compete, using the following list and the delivery specifications: • 1 Power Analyzer • 1 Operators Manual • 1 mains (power) cable • 1 calibration certificate • 1 built-in printer (if ordered) • 1 to 6 voltage and current channel modules, according to the delivery specifications Installation and Switching On Installation XW Warning To avoid possible electric shock or personal injury: • The device is connected to the power mains with a number of internal components live with dangerous voltage levels. • The device must be equipped with a low-resistance connection to earth ground. • Carefully check the mains socket and its wiring. To install: 1. Follow the safety instructions regarding ambient conditions and location of installation. 2. Place the device on a clean and stable surface. 3. If necessary, adjust the feet at the base of the unit to improve the view of the display. Switching Device On To turn the Analyzer on: 1. Connect the Analyzer to the power (mains) socket, using the power cable. 2. Set the power switch on the back of the housing to I (on). The Analyzer is now ready for operation. The following start screen displays. 4-3 MyFlukeStore Shop for Fluke products online at: www. .com 1.888.610.7664