GE ASH08FK Owners Manual - Page 15
Through-the-Wall, Installation, Instructions--Optional
UPC - 084691159704
View all GE ASH08FK manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 15 highlights
Through-the-Wall Installation Instructions--Optional The case may be installed through the wall in both existing and new construction. Read completely, then follow step-by-step. [] IMPORTANT Through-the-wall installation is not appropriate if any of the side louvers in the case will be obstructed by the wall. All side louvers in the case must project on the outdoor side of the wall. The room side of the case must project into the room at least 13A" from the finished wall. The case must be installed level from sideto-side and with a slight tilt from front to rear. Use a level; about a 1/2 bubble will be the correct case slant to the outside. [] Remove the air conditioner from the case. For specific instruction, refer to the Window Installation Instructions. [] Make certain that a wall receptacle is available close to the hole location or make arrangements to install a receptacle. [] FINISH THE WALL OPENING Caulk all four sides on the outdoor side of the case to prevent moisture from getting through to the interior wall. Use of flashing (drip rail) will further prevent water from dripping inside the wall and down the outside of the building. // _ I-- Plaster line Lintel angle (if required_ L • Caulk,ng _P_J II[ Trim molding (if desired) OUTSIDE Air louvers (must project on the outdoor side of the wall) INSIDE / Bottom rail Wood Filler and Caulking_ (above and below the flashing) / I(_/II/I._. _ Flashing (Drip rail) T 4.5 cm (13/4") min. [] Place the case in the wall opening and secure with 12 1" long #10 wood screws. NOTE: Drill pilot holes, if necessary, for proper installation. If the frame is oversized, use shims to prevent case distortion. 15