GE ASH08FK Owners Manual - Page 9
Air Conditioner
UPC - 084691159704
View all GE ASH08FK manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
Installation Instructions Air Conditioner -?-i Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: www.GEAppliances.com I BEFORE YOU BEGIN Read these instructions completely and carefully. • IMPORTANT - Savethese instructions for local inspector's use. • IMPORTANT - Observaell governing codes and ordinances. • Note to Installer - Be sure to leave these instructions with the Consumer. • Note to Consumer - Keep these instructions for future reference. • Skill level - Installation of this appliance requires basic mechanical skills, • Completion time - Approximately • We recommend this product. that two people 1 hour install • Proper installation is the responsibility of the installer. • Product failure due to improper installation is not covered under the Warranty. CAUTION: Do not, under any circumstances, cut or remove the third (ground) prong from the power cord. Do not change the plug on the power cord of this air conditioner. Aluminum house wiring may present special problems--consult a qualified electrician. TOOLS YOU WILL NEED Phillips head screwdriver Adjustable wrench Ruler or tape measure (_) ELECTRICAL REQUIREMENTS S60omHez gmrooudnedlsed reqouuitrleet apr1o1te5c/1te2d0-vowltith aa.c., 15-amp time delay fuse or circuit breaker. The 3-prong grounding plug minimizes the possibility of electric shock hazard. If the wall outlet you plan to use is only a 2-prong outlet, it is your responsibility to have it replaced with a properly grounded 3-prong wall outlet. © Some models require 230/208-volt a.c., protected with a time delay fuse or circuit breaker. These models should be installed @on their own single branch circuit for best performance and to prevent overloading house or apartment wiring circuits, which could cause a possible fire hazard from overheating wires. Pencil Scissors or knife Level