GE CWB7030SLSS Installation Instructions - Page 2
Safety Information, BEFORE YOU BEGIN - installation
View all GE CWB7030SLSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 2 highlights
Safety Information BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT - Save these instructions for local inspector's use. IMPORTANT - Observe all governing codes and ordinances. • Note to Installer - Be sure to leave these instructions with the Consumer. • Note to Consumer - Keep these instructions with your Owner's Manual for future reference. • Skill Level - Installation of this appliance requires basic mechanical and electrical skills. • Completion Time - 1 Hour. • Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the warranty. See Owner's Manual for warranty information. NOTE: This oven is only approved to be installed under the specific models as labeled on this unit. IMPORTANT - Use this oven only for its intended purpose. Never use the oven for warming or heating a room. Prolonged use of the oven without proper ventilation can be hazCarAdoUusT. ION For personal safety, remove house fuse or oven circuit breaker before beginning installation to avoid severe or fatal shoCckAinUjuTryI.ON For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of the oven and drawer, plus additional oven loadCs.AUTION If installing the Advantium/ Convection 120V Oven below 36Ǝ, you must use the plastic bottom trim due to burn risk to children. The plastic trim acts as insulation and will help prevent burns to children from hot surfCacAesU. TION If installing the Advantium/ Convection 120V Oven below 36Ǝ, do not remove the plastic door trim due to burn risk to children. The plastic trim acts as insulation and will help prevent burns to children from hot surfaces. CONTENTS Design Information Models Available 2 Product Dimensions and Clearances 3 Tools Required 3 Parts Supplied 3 Advance Planning 3 Installation Preparation Electrical Requirements 4 Preparing the Opening (Standard 5-8 Preparing the Opening (Flush Mount)..........9-10 Storage Drawer Preparation Standard 11 Flush 11 Installation Instructions Step 1, Remove Packaging and Parts 12 Step 2, Door Trim Removal for above 36" Installation only 13 Step 3, Slide the Oven into the Cutout 13 Step 4, Install Bottom Trim 14 Step 5, Install Bottom Trim with Accessory Drawer 14 Step 6, Install Mounting Screws 14 Step 7, Finalize Installation 14 MODELS AVAILABLE Profile Models: PSB9120WW - White* PSB9120BB - Black PSB9120SS - Stainless Steel PSB9120ES - Slate PWB7030SL - Stainless Steel PWB7030EL - Slate Monogram Models: ZSC1201SS - Stainless Steel ZSC1202SS - Stainless Steel** Café Model: CSB9120SS - Stainless Steel CWB7030SL - Stainless Steel *No color-matched drawer available for this model. **This unit cannot be installed with an accessory storage drawer. 2