GE CWB7030SLSS Installation Instructions - Page 7

Prepare The Opening Cont. - microwave oven

Page 7 highlights

Standard Installation Preparation IMPORTANT: Always maintain 36-3/4" minimum height from the floor to the cutout in any single or combined installation unless plastic trim is installed. PREPARE THE OPENING (cont.) Installation over another GE Appliances/ Monogram Built-In SpeedCook Oven: 30Ǝ 23-1/2Ǝ Construct solid bottom - Min. 3/8" plywood supported on all four sides. Must be able to 25-1/4Ǝ support weight of oven and contents. PREPARE THE OPENING (cont.) Installation under a GE Appliances/ Monogram Microwave Oven and over a Warming Drawer: Construct 30Ǝ 23-1/2Ǝ solid bottom - Min. 3/8" plywood supported on all four sides. Must be able to 25-1/4Ǝ support weight of oven and contents. 17-1/2Ǝ 2Ǝ Min. (3Ǝ Recommended) Per Microwave Oven Requirement 3.5Ǝ Min. (4.5Ǝ Recommended) 17-1/2Ǝ • If you are mounting a GE Appliances Appliances/Monogram Built-In SpeedCook Oven over another, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2Ǝ minimum shown. 17-1/2Ǝ Per Warming Drawer Requirement 2Ǝ Min. (3Ǝ Recommended) NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. CAUTION For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of the oven and drawer, plus additional oven loads. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

7
Standard Installation Preparation
PREPARE THE OPENING (cont.)
Installation under a GE Appliances/
Monogram Microwave Oven and over a
Warming Drawer:
NOTE:
Additional clearances between the
cutouts may be required. Check to be sure
the oven supports above the Warming Drawer
location do not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
CAUTION
For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of the oven and drawer, plus additional oven
loads.
PREPARE THE OPENING (cont.)
Installation over another GE Appliances/
Monogram Built-In SpeedCook Oven:
If you are mounting a GE Appliances
Appliances/Monogram Built-In
SpeedCook
Oven over another, use the dimensions
shown.
The middle rail separating the two openings
may need to be larger than the 2 minimum
shown.
30
23-1/2
25-1/4
17-1/2
2 Min.
(3 Recommended)
17-1/2
Construct
solid bottom - Min.
3/8” plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
30
23-1/2
25-1/4
17-1/2
2 Min.
(3 Recommended)
Per Microwave
Oven Requirement
3.5 Min.
(4.5 Recommended)
Per Warming
Drawer
Requirement
Construct
solid bottom - Min.
3/8” plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
IMPORTANT:
Always maintain 36-3/4” minimum height from the floor to the cutout in any single or
combined installation unless plastic trim is installed.