GE JGP637BEJBB Owners Manual - Page 18
Preparing The Opening
View all GE JGP637BEJBB manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
Installation Instructions A PREPARING THE OPENING A1 The following MINIMUM clearance dimensions must be maintained. 13" MAX. Depth of unprotected overhead cabinets 3 3/4 MIN. clearance from cutout to side wall on the right of the unit 30" MIN. clearance from countertop to unprotected overhead surface 18" MIN. height from countertop to nearest cabinet on either side of unit 3 3/4" MIN. clearance from cutout to side wall on the left of the unit A2 Overall cooktop dimensions 36" 21" COOKTOP 3 3/16" 19" 33 3/4" A3 Cutout dimensions of the countertop To insure accuracy, it is best to make a template when cutting the opening in the counter. 2 1/4" Min. Between cutout and the wall behind the cooktop 33 7/8" length of cut 2 1/2" Min. from front edge of cutout and front edge of countertop 19 1/8" width of cut 16 15/16" A4 The recommended Gas Supply Location from the backwall. 1" Min. From Backwall 9" Recommended gas supply location. From Cutout Center Line A5 Make sure the wall coverings, countertop and cabinets around the cooktop can withstand heat (up to 200°F) generated by cooktop. Wall covering, cabinets and countertop must withstand heat up to 200°F. 18