GE PWB7030ELES Installation Instructions - Page 5

Standard Installation Preparation

Page 5 highlights

Standard Installation Preparation IMPORTANT: Always maintain 36-3/4" minimum height from the floor to the cutout in any single or combined installation unless plastic trim is installed. PREPARE THE OPENING The Advantium/Convection 120 can be installed in combination with other GE Appliances/ Monogram appliances. Always follow each product's Installation Instructions to complete the installation. Single Advantium/Convection 120 Installation: Order a 30" wide single oven cabinet or cut the opening in a wall to the dimensions shown. 30" 23-1/2" 25-1/4" PREPARE THE OPENING (CONT.) Installation over a GE Appliances/ Monogram Warming Drawer: 30" 17-1/2" 23-1/2" 25-1/4" Construct solid bottom - Min. 3/8" plywood supported on all four sides. Must be able to support weight of oven and contents. 2" Min. (3" Recommended) Per Warming Drawer Requirement 17-1/2" 36-3/4" Min. Construct solid bottom - Min. 3/8" plywood supported on all four sides. Must be able to support weight of oven and contents. 36-3/4" Min. NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location does not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. • Allow 1-1/4" case trim overlap at the top and 7/8" overlap on the bottom and 2-1/4" overlap for each side of the opening. • Oven overlaps will conceal cut edges on all sides of the opening. When installed over a single oven or a warming drawer, allow at least 2" between the two openings. This separation will provide clearance for bottom overlap of the Advantium/ Convection 120 and the other appliance overlaps. • The support must be level and rigidly mounted, flush with the bottom edge of the cutout. 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

5
Standard Installation Preparation
PREPARE THE OPENING
(CONT.)
Installation over a GE Appliances/
Monogram Warming Drawer:
NOTE:
Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location does
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
30”
23-1/2”
25-1/4”
17-1/2”
36-3/4”
Min.
2” Min.
(3” Recommended
)
Per Warming
Drawer
Requirement
Construct
solid bottom
- Min. 3/8”
plywood
supported
on all four
sides. Must be
able to support
weight of oven
and contents.
PREPARE THE OPENING
The Advantium/Convection 120 can be installed
in combination with other GE Appliances/
Monogram appliances. Always follow each
product’s Installation Instructions to complete the
installation.
Single Advantium/Convection 120
Installation:
Order a 30” wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
Allow 1-1/4” case trim overlap
at the top and 7/8” overlap on the bottom and
2-1/4” overlap for each side of the opening.
Oven overlaps will conceal cut edges on all
sides of the opening.
When installed over a single oven or a
warming drawer, allow at least 2” between
the two openings. This separation will provide
clearance for bottom overlap of the Advantium/
Convection 120 and the other appliance
overlaps.
The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
30”
23-1/2”
25-1/4”
17-1/2”
Construct
solid bottom
- Min. 3/8”
plywood
supported
on all four
sides. Must
be able to
support
weight of
oven and
contents.
36-3/4”
Min.
IMPORTANT:
Always maintain 36-3/4” minimum height from the floor to the cutout in any single or
combined installation unless plastic trim is installed.