GE PWB7030ELES Installation Instructions - Page 6
Prepare The Opening
View all GE PWB7030ELES manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Standard Installation Preparation IMPORTANT: Always maintain 36-3/4" minimum height from the floor to the cutout in any single or combined installation unless plastic trim is installed. PREPARE THE OPENING (CONT.) Installation over a GE Applainces/ Monogram Oven: Construct 30" 23-1/2" solid bottom - Min. 3/8" plywood supported on all four sides. Must be able to 25-1/4" support weight of oven and contents. PREPARE THE OPENING (CONT.) Installation over a GE Appliances/ Monogram Oven and Warming Drawer: 30" Construct 23-1/2" solid bottom Min. 3/8" plywood supported on all four sides. Must be able to support weight 25-1/4" of oven and contents. 17-1/2" 45-1/4" Min. 2" Min. (3" Recommended) Per Oven Requirement * If you are replacing a GE Appliances/ Monogram electric double oven with the combined installation of an Advantium/ Convection 120 and a single oven, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2" minimum shown. 17-1/2" 45-1/4" 2" Min. (3" Recommended) Per Oven Requirement 2" Min. (3" Recommended) Per Warming Drawer Requirement NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location does not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. CAUTION For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of the oven and drawer, plus additional oven loads. 6