Haier HHV3330DBBB HHV3330 Manual - Page 5

Installation Preparation, Preparing Hood Location

Page 5 highlights

English Installation Preparation To install this range hood, you will need the following tools and materials: Note: This procedure will require 2 people for easier installation. Tools Needed for Installation • Drill • 1/8" Drill bit for drilling pilot holes • 1-1/4" Wood bit for drilling electrical wiring access hole • Phillips head screwdriver • Flat-head screwdriver • Pliers • Pencil, ruler and level for marking range hood location • Hand saw or jig saw for cutting the wall or cabinet openings • Hi-Temp duct tape • Electrical tape • Connector Clamp Preparing Hood Location 1. Determine whether hood will discharge vertically (3¼" x 10" or 7" Round), horizontally (3¼" x 10" only) or non-ducted. For vertical or horizontal discharge, run ductwork between the hood location and a roof cap or wall cap. For best results, use a minimum number of transitions and elbows. 2. Use diagram, below, for proper placement of ductwork and electrical cutout in cabinet or wall. For a non-ducted installation, DO NOT cut a duct access hole. 3. Run house wiring between service panel and hood location. 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

English
4
Installation Preparation
To install this range hood, you will need the following tools and materials:
Note: This procedure will require 2 people for easier installation.
Tools Needed for Installation
• Drill
• 1/8” Drill bit for drilling pilot holes
• 1-1/4” Wood bit for drilling electrical wiring access hole
• Phillips head screwdriver
• Flat-head screwdriver
• Pliers
• Pencil, ruler and level for marking range hood location
• Hand saw or jig saw for cutting the wall or cabinet openings
• Hi-Temp duct tape
• Electrical tape
• Connector Clamp
Preparing Hood Location
1.
Determine whether hood will discharge vertically (3¼” x 10” or 7” Round),
horizontally (3¼” x 10” only) or non-ducted. For vertical or horizontal discharge,
run ductwork between the hood location and a roof cap or wall cap. For best
results, use a minimum number of transitions and elbows.
2.
Use diagram, below, for proper placement of ductwork and electrical cutout in
cabinet or wall. For a non-ducted installation, DO NOT cut a duct access hole.
3.
Run house wiring between service panel and hood location.