Haier HHV3330DBBB HHV3330 Manual - Page 5
Installation Preparation, Preparing Hood Location
![]() |
View all Haier HHV3330DBBB manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
English Installation Preparation To install this range hood, you will need the following tools and materials: Note: This procedure will require 2 people for easier installation. Tools Needed for Installation • Drill • 1/8" Drill bit for drilling pilot holes • 1-1/4" Wood bit for drilling electrical wiring access hole • Phillips head screwdriver • Flat-head screwdriver • Pliers • Pencil, ruler and level for marking range hood location • Hand saw or jig saw for cutting the wall or cabinet openings • Hi-Temp duct tape • Electrical tape • Connector Clamp Preparing Hood Location 1. Determine whether hood will discharge vertically (3¼" x 10" or 7" Round), horizontally (3¼" x 10" only) or non-ducted. For vertical or horizontal discharge, run ductwork between the hood location and a roof cap or wall cap. For best results, use a minimum number of transitions and elbows. 2. Use diagram, below, for proper placement of ductwork and electrical cutout in cabinet or wall. For a non-ducted installation, DO NOT cut a duct access hole. 3. Run house wiring between service panel and hood location. 4
![](/manual_guide/products/haier-hhv3330dbbb-hhv3330-manual-7edc194/5.png)