HP 10636 HP Ground Bonding Rack Option Kit Installation Guide - Page 9
Installing the ground bonding rack option kit on HP 10000 G2 Series Rack side panels - g2 rack
View all HP 10636 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
From the rack to a building facility, contact your building supervisor for more information. The following figure illustrates parts for this step. Reference 1 2 3 4 5 Item 48.26-cm (19-in) mounting rail (the mounting hole is located at the top or bottom of the rail) M8 hex nut M8 Belleville toothed washer Facility ground (not included with this kit) M8 x 20 bolt Installing the ground bonding rack option kit on HP 10000 G2 Series Rack side panels From the middle system chassis rail to the bottom side panel: 1. Connect a 36.83-cm (14.5-in) and a 15.24-cm (6-in) grounding strap with connectors together. 2. Insert a T-25 Torx screw through the end of the 36.83-cm (14.5-in) grounding strap, and secure it to the middle system chassis rail. 3. Place the end of the 15.24-cm (6-in) grounding strap over the grounding lug on the bottom side panel. 4. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the bottom side panel and tighten. Installing the HP Ground Bonding Rack Option Kit 9