HP 10647 10842 Rack Reference Guide - Page 16

Installation Service, This Guide.

Page 16 highlights

Overview 8. Install products such as Uninterruptible Power System (UPS) units starting from the bottom of the rack. 9. Install the appropriate support rails and/or tray for the first rack-mountable component. 10. Install the first individual component. 11. Attach a cable management arm, if required. 12. Attach the appropriate cables and power cords to the component, being sure to adhere to all cautions and warnings. 13. Install the remaining components in the appropriate sequence. 14. Reinstall any doors and panels. 15. Power up and configure the system. Installation Service In the United States, HP can make arrangements to have your rack system installed by qualified guaranteed service providers. This installation service covers the entire hardware installation sequence, from unpacking the components to cable routing and running a test of the system. For more information on HP support, refer to "About This Guide." 1-6 HP 10842 Rack Reference Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70

Overview
1-6
HP 10842 Rack Reference Guide
8.
Install products such as Uninterruptible Power System (UPS) units starting from
the bottom of the rack.
9.
Install the appropriate support rails and/or tray for the first rack-mountable
component.
10.
Install the first individual component.
11.
Attach a cable management arm, if required.
12.
Attach the appropriate cables and power cords to the component, being sure to
adhere to all cautions and warnings.
13.
Install the remaining components in the appropriate sequence.
14.
Reinstall any doors and panels.
15.
Power up and configure the system.
Installation Service
In the United States, HP can make arrangements to have your rack system installed
by qualified guaranteed service providers. This installation service covers the entire
hardware installation sequence, from unpacking the components to cable routing and
running a test of the system. For more information on HP support, refer to “About
This Guide.”