HP 11622 HP 11000 G2 Series Rack User Guide - Page 13

Rack Tie-down Option kit, HP Rack Options Installation Guide for the HP 11000 G2 Series Racks - g2 rack

Page 13 highlights

• The heavy duty 600-mm (23.6 in) or 800-mm (31.5 in) front foot is required when a single rack-mountable component weighing 99.8 kg (220 lb) or more is installed in a stand-alone rack or in a rack belonging to a rack row of three or fewer bayed racks. Observe the following guidelines when using multiple-rack configurations: • A stabilizer kit is required or recommended, depending on your rack configuration. • The side feet are required for standalone racks. • The number of baying kits needed is one less than the total number of racks in a row. • Position and install the baying option kit before populating the racks with components. • The weight of the rack must rest on the leveling feet. Rack Tie-down Option kit The Rack Tie-Down Option kit enables you to secure HP 11000 G2 Series Racks to the floor. HP recommends having the building structural engineer drill the holes. Secure the rack to the floor with approved bolts and washers. For more information, see the HP Rack Options Installation Guide for the HP 11000 G2 Series Racks and Intelligent Series Racks. Preparing the rack for component installation 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27

Preparing the rack for component installation
13
The heavy duty 600-mm (23.6 in) or 800-mm (31.5 in) front foot is required when a single
rack-mountable component weighing 99.8 kg (220 lb) or more is installed in a stand-alone rack or in
a rack belonging to a rack row of three or fewer bayed racks.
Observe the following guidelines when using multiple-rack configurations:
A stabilizer kit is required or recommended, depending on your rack configuration.
The side feet are required for standalone racks.
The number of baying kits needed is one less than the total number of racks in a row.
Position and install the baying option kit before populating the racks with components.
The weight of the rack must rest on the leveling feet.
Rack Tie-down Option kit
The Rack Tie-Down Option kit enables you to secure HP 11000 G2 Series Racks to the floor.
HP recommends having the building structural engineer drill the holes. Secure the rack to the floor with
approved bolts and washers.
For more information, see the
HP Rack Options Installation Guide for the HP 11000 G2 Series Racks and
Intelligent Series Racks.