HP 11622 HP 11000 G2 Series Rack User Guide - Page 26

Index

Page 26 highlights

Index A airflow requirements 6 B before you contact HP 22 blanking panels 6 C cage nuts, installing 14 checking the hardware 8 components, installation 14 configuration factors 5 D documentation feedback 25 E electrostatic discharge 21 F front door, removing 9 G general component placement guidelines 6 grounding methods 21 H HP contact information 22 HP eCo-Enterprise Configurator 5 I installing cage nuts 14 installing components 14 installing the hook-and-loop cabling strap clips 15 K kit contents 8 O optimum environment 6 ordering rack options 17 P power requirements 5 preparing the rack for component installation 8 R rack configuration software 5 rack doors, removing 9 rack options 17 rack tie-down option kit 13 rear doors, removing 10 regulatory compliance information 23 regulatory information 23 removing the front door 9 removing the rear door lock bar 10 removing the rear doors 10 removing the side panels 11 required tools 8 requirements, airflow 6 requirements, power 5 requirements, space 5 requirements, temperature 6 S side panels, removing 11 space requirements 5 specifications 19, 20 stabilizing requirements 12 support and other resources 22 T temperature requirements 6 tools 8 Turkey RoHS material content declaration 23 U Ukraine RoHS material content declaration 23 Index 26

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27

Index 26
A
airflow requirements 6
B
before you contact HP 22
blanking panels 6
C
cage nuts, installing 14
checking the hardware 8
components, installation 14
configuration factors 5
D
documentation feedback 25
E
electrostatic discharge 21
F
front door, removing 9
G
general component placement guidelines 6
grounding methods 21
H
HP contact information 22
HP eCo-Enterprise Configurator 5
I
installing cage nuts 14
installing components 14
installing the hook-and-loop cabling strap clips 15
K
kit contents 8
O
optimum environment 6
ordering rack options 17
P
power requirements 5
preparing the rack for component installation 8
R
rack configuration software 5
rack doors, removing 9
rack options 17
rack tie-down option kit 13
rear doors, removing 10
regulatory compliance information 23
regulatory information 23
removing the front door 9
removing the rear door lock bar 10
removing the rear doors 10
removing the side panels 11
required tools 8
requirements, airflow 6
requirements, power 5
requirements, space 5
requirements, temperature 6
S
side panels, removing 11
space requirements 5
specifications 19, 20
stabilizing requirements 12
support and other resources 22
T
temperature requirements 6
tools 8
Turkey RoHS material content declaration 23
U
Ukraine RoHS material content declaration 23
Index