HP 11622 HP 11000 G2 Series Rack User Guide - Page 14
Installing components, Installing components on a HP 11000 G2 Series Rack, Installing the cage nuts
View all HP 11622 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
Installing components Installing components on a HP 11000 G2 Series Rack IMPORTANT: These installation instructions are for standard installations. For specific installation instructions, refer to the documentation included with your component. The following steps outline the sequence for installing rack-mountable components in a rack. HP strongly recommends installing a stabilizer foot before any other component. Install 0U devices first, such as PDUs, console switches, and so on. To install components: 1. Install the cage nuts ("Installing the cage nuts" on page 14) into the rack (if required). 2. Prepare and install the rails into the rack. 3. Prepare and install the component into the rack and secure it. 4. Attach the cable management arm to the rack and then to the component. 5. Attach any cables and power cords, being sure that you adhere to all cautions and warnings contained in the individual component installation instructions. Remove the cable access panel and route the cables. Installing the cage nuts Use the cage nut insertion tool to install the cage nuts on the inside of the mounting rails. To install the cage nuts: 1. Hook the bottom lip of the cage nut in the square-rail perforation. 2. Insert the tip of the insertion tool through the perforation, and then hook the top lip of the cage nut. Installing components 14