HP Integrity rx4640 Site Preparation Guide, Second Edition - HP Integrity rx46 - Page 41
Table 2-5, Site Inspection Checklist Continued, Please check either Yes or No. If No
View all HP Integrity rx4640 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 41 highlights
General Site Preparation Guidelines Sample Site Inspection Checklist Table 2-5 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment# or date 9. Is a telephone line available? 10. Are customer supplied peripheral cables and LAN cables available and of the proper type? 11. Are floor tiles in good condition and properly braced? 12. Is floor tile underside shiny or painted? If painted, judge the need for particulate test. Power and lighting No. Area or condition Yes No 13. Are lighting levels adequate for maintenance? 14. Are there AC outlets available for servicing needs? (for example, vacuuming) 15. Does the input voltage correspond to equipment specifications? 15A Is dual source power used? If so, identify type(s) and evaluate grounding. 16 Does the input frequency correspond to equipment specifications? 17. Are lightning arrestors installed inside the building? 18. Is power conditioning equipment installed? 19. Is there a dedicated branch circuit for equipment? 20. Is the dedicated branch circuit less than 250 feet (72.5 meters)? 21. Are the input circuit breakers adequate for equipment loads? Safety No. Area or condition 22. Is there an emergency power shut-off switch? 23. Is there a telephone available for emergency purposes? 24. Is there a fire protection system in the computer room? Yes No 25. Is antistatic flooring installed? 26. Are there any equipment servicing hazards (loose ground wires, poor lighting, and so on)? Cooling Comment or Date Chapter 2 41