HP Integrity rx4640 Site Preparation Guide, Second Edition - HP Integrity rx46 - Page 44

Delivery Survey Part 1, Please list number of flights and stairway dimensions.

Page 44 highlights

General Site Preparation Guidelines Delivery Survey Figure 2-2 Delivery Survey (Part 1) ELEVATOR Fill in the following information if an elevator is required to move equipment. Capacity (lb or kg Depth Height Width Depth Width Height STAIRS Please list number of flights and stairway dimensions. Number of flights Width Width Number of flights Width Width Width Width 44 Chapter 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49

General Site Preparation Guidelines
Delivery Survey
Chapter 2
44
Figure 2-2
Delivery Survey (Part 1)
ELEVATOR
Fill in the following information if an elevator is required to move equipment.
Capacity (lb or kg) ________________
Depth ________________
Height ________________
Width ________________
Depth
Height
Width
STAIRS
Please list number of flights and stairway dimensions.
Number of flights _____________________
Width ______________________
Width ______________________
Number of flights _____________________
Width ______________________
Width ______________________
Width
Width