HP Integrity rx4640 Site Preparation Guide, Second Edition - HP Integrity rx46 - Page 42
Please check either Yes or No. If No, include comment# or date, Comment or Date
![]() |
View all HP Integrity rx4640 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 42 highlights
General Site Preparation Guidelines Sample Site Inspection Checklist Table 2-5 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment# or date No. Area or condition Yes No 27. Can cooling be maintained between 20° C and 55° C (up to 5,000 ft.)? Derate 1° C/1,000 ft. above 5,000 ft. and up to 10,000 ft. 28. Can temperature changes be held to 10° C per hour with tape media? Can temperature changes be held to 20° C per hour without tape media? 29. Can humidity level be maintained at 40% to 60% at 35° C noncondensing? 30. Are air conditioning filters installed and clean? Storage No. Area or condition Yes No 31. Are cabinets available for tape and disc media? 32. Is shelving available for documentation? Training No. Area or Condition 33 Are personnel enrolled in the System Administrator's Course? 34 Is on-site training required? Comment or Date 42 Chapter 2
![](/manual_guide/products/hewlettpackard-integrity-rx4640-site-preparation-guide-edition-hp-integrity-rx4640-server-9c382f3/42.png)