HP Integrity rx7620 Installation Guide, Seventh Edition - HP Integrity rx7620 - Page 76

before verifying that the cabinet has been wired into the site AC power

Page 76 highlights

Cable Connections AC Voltage Check (Additional Procedure) WARNING Do not set site AC circuit breakers serving the processor cabinets to ON before verifying that the cabinet has been wired into the site AC power supply correctly. Failure to do so may result in injury to personnel or damage to equipment when AC power is applied to the cabinet. Step 9. Set the site power circuit breaker to ON. Step 10. Set the server power to ON. Step 11. Check that the indicator light on each power supply is lit. 76 Chapter 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94

Chapter 4
Cable Connections
AC Voltage Check (Additional Procedure)
76
WARNING
Do not set site AC circuit breakers serving the processor cabinets to
ON
before verifying that the cabinet has been wired into the site AC power
supply correctly. Failure to do so may result in injury to personnel or
damage to equipment when AC power is applied to the cabinet.
Step 9.
Set the site power circuit breaker to
ON
.
Step 10.
Set the server power to
ON
.
Step 11.
Check that the indicator light on each power supply is lit.