HP LH4r HP Netserver LXr 8000 Rack Cabling Guide - Page 18

Data & Voice Communications Pre-Tested and Verified

Page 18 highlights

Chapter 2 Connecting and Routing Cables to the HP NetServer LXr 8000 Table 2-1. Site Preparation Checklist (Continued) Environment and Space Requirements Must meet OSHA, local code, and HP specifications for safety and supportability (3 feet minimum access in front and rear of electrical cabinets) Side access of 24 inches improves cable routing and management 24 hour air conditioning (68 - 72 deg. F; 20 - 22 deg. C, 40 - 60% RH) Table or work space big enough for console terminal and user guides Bookshelf for documentation Area to store equipment until time of installation Ensure all equipment and/or shipping pallets can fit through doorways, hallways, and into and out of elevators Data & Voice Communications (Pre-Tested and Verified) Voice phone located at system console terminal with cord long enough to reach all parts of the rack installation Phone line for remote support at each system Ethernet, FDDI, Token Ring, or other standard System Parameters Hostname IP address Subnet Mask Gateway IP Address Gateway Host Name DTC Node Name Hardware Configuration, Cables, and so on Availability of I/O paths and SCSI addresses for add-on devices Availability of I/O backplane slots, memory slots, and so on Valid, supportable configuration for added devices, interfaces, memory, and so forth Correct type and length of cables, as specified in order documents 14

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53

Chapter 2
Connecting and Routing Cables to the HP NetServer LXr 8000
14
Table 2-1. Site Preparation Checklist (Continued)
Environment and Space Requirements
Must meet OSHA, local code, and HP specifications for safety and supportability (3 feet
minimum access in front and rear of electrical cabinets)
Side access of 24 inches improves cable routing and management
24 hour air conditioning (68 - 72 deg. F; 20 - 22 deg. C, 40 - 60% RH)
Table or work space big enough for console terminal and user guides
Bookshelf for documentation
Area to store equipment until time of installation
Ensure all equipment and/or shipping pallets can fit through doorways, hallways, and into
and out of elevators
Data & Voice Communications (Pre-Tested and Verified)
Voice phone located at system console terminal with cord long enough to reach all parts of
the rack installation
Phone line for remote support at each system
Ethernet, FDDI, Token Ring, or other standard
System Parameters
Hostname
IP address
Subnet Mask
Gateway IP Address
Gateway Host Name
DTC Node Name
Hardware Configuration, Cables, and so on
Availability of I/O paths and SCSI addresses for add-on devices
Availability of I/O backplane slots, memory slots, and so on
Valid, supportable configuration for added devices, interfaces, memory, and so forth
Correct type and length of cables, as specified in order documents