HP LH4r HP Netserver LXr 8000 Rack Cabling Guide - Page 42

Power Up the Components in the Rack

Page 42 highlights

Chapter 2 Connecting and Routing Cables to the HP NetServer LXr 8000 Figure 2-12. Forming the LXr 8000 Cable Management Loop Power Up the Components in the Rack Follow the Power Up Sequence to minimize initial surge currents and prevent breakers from tripping. Power Up Sequence 1. Ensure that the mass storage unit DIP switches are set for SCSI ID spinup order. See documentation included with the unit for more information. 2. Power on the tape back-up unit, if one is present. 3. Power on the mass storage units, one at a time. 4. Power on the monitor. 38

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53

Chapter 2
Connecting and Routing Cables to the HP NetServer LXr 8000
38
Figure 2-12. Forming the LXr 8000 Cable Management Loop
Power Up the Components in the Rack
Follow the Power Up Sequence to minimize initial surge currents and prevent
breakers from tripping.
Power Up Sequence
1.
Ensure that the mass storage unit DIP switches are set for SCSI ID spin-
up order. See documentation included with the unit for more information.
2.
Power on the tape back-up unit, if one is present.
3.
Power on the mass storage units, one at a time.
4.
Power on the monitor.