HP Latex 3100 Site Preparation Guide - Page 33

Checklist

Page 33 highlights

4 Checklist Address information Company name Street address City Country Postal code Telephone Fax E-mail Contact persons Company engineer or technician System administrator Operators to be trained on printer use and maintenance Name Telephone Email Printer HP Latex 3000 HP Latex 3100/3200 HP Latex 3500/3600 Hp Latex 3800 Jumbo Roll Solution General access & equipment unloading Yes No Is there an easily accessible unloading area, with sufficient space to unload and maneuver the equipment? Has the route to the installation area been checked to meet all requirements (height, width, and clearance of ceilings, doorways, ramps, and corridors) and is the conveyance route clear? Is a power outlet available near the site where you plan to disassemble the crate (for the electric screwdriver used to disassemble the crate)? Have specialist movers been contracted to unload and move the equipment on the date required? Are the specialist movers aware of the specifications provided in this document? Is a suitable forklift contracted for installation? Are there skates available to help position the crate? Comments ENWW 29

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37

4
Checklist
Address information
Company name
Postal code
Street address
Telephone
City
Fax
Country
E-mail
Contact persons
Name
Telephone
Email
Company engineer or technician
System administrator
Operators to be trained on printer use and maintenance
Printer
HP Latex 3000
HP Latex 3100/3200
HP Latex 3500/3600
Hp Latex 3800 Jumbo Roll Solution
General access & equipment unloading
Yes
No
Comments
Is there an easily accessible unloading area, with sufficient space to unload and
maneuver the equipment?
Has the route to the installation area been checked to meet all requirements
(height, width, and clearance of ceilings, doorways, ramps, and corridors) and is the
conveyance route clear?
Is a power outlet available near the site where you plan to disassemble the crate
(for the electric screwdriver used to disassemble the crate)?
Have specialist movers been contracted to unload and move the equipment on the
date required?
Are the specialist movers aware of the specifications provided in this document?
Is a suitable forklift contracted for installation?
Are there skates available to help position the crate?
ENWW
29