HP Latex 3100 Site Preparation Guide - Page 34

Checklist

Page 34 highlights

General access & equipment unloading Yes No Is there a pallet jack available to help position the crate? Will you install the printer on a second level or higher? If so, is there a suitable crane contracted for installation? Are the appropriate crane attachments available? Will the operator be available for the full amount of time required for the installation training (2.5 days)? Comments HP Latex 3100/3200/3500/3600 only: Optional HP Latex 3800 only: Required HP Latex 3800 only: Discuss with HP HP Latex 3800 only: 4 days Room layout and flooring Yes No Is there sufficient space around the equipment? Has all room construction and painting been completed? Does the floor load-bearing capacity meet the specifications in the site preparation guide? Does the floor surface meet the specifications in the site preparation guide? If special reinforcements are necessary, are they completed? If your printer is an HP Latex 3500, is the floor prepared to anchor the printer to the floor and to install the dual-roll split spindles center support? Comments Safety requirements Yes No Is there an emergency exit in the print production area, with easy access and free from any obstruction? Have the two fire extinguishers been fitted in the prescribed locations in the print production and storage areas? Is the print production fire extinguisher rated for electrical fire? Have strategic locations been allocated for the fixture and display of the appropriate safety warning signs? Does the area meet the Restricted Access Location requirements in the zone surrounding the printer? Do the users who operate the printer have appropriate technical training and experience necessary to be aware of the hazards to which they may be exposed in performing a task and to take appropriate measures to minimize the risks? Will printer operations be supervised at all times? Does the room meet the minimal ventilation (ACHs) standard required by local regulations and/or HP requirements? Comments (Required) (Required) (Required) (Required) 30 Chapter 4 Checklist ENWW

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37

General access & equipment unloading
Yes
No
Comments
Is there a pallet jack available to help position the crate?
HP Latex 3100/3200/3500/3600 only: Optional
HP Latex 3800 only: Required
Will you install the printer on a second level or higher? If so, is there a suitable
crane contracted for installation? Are the appropriate crane attachments available?
HP Latex 3800 only: Discuss with HP
Will the operator be available for the full amount of time required for the
installation training (2.5 days)?
HP Latex 3800 only: 4 days
Room layout and flooring
Yes
No
Comments
Is there sufficient space around the equipment?
Has all room construction and painting been completed?
Does the floor load-bearing capacity meet the specifications in the site preparation
guide?
Does the floor surface meet the specifications in the site preparation guide? If
special reinforcements are necessary, are they completed?
If your printer is an HP Latex 3500, is the floor prepared to anchor the printer to the
floor and to install the dual-roll split spindles center support?
Safety requirements
Yes
No
Comments
Is there an emergency exit in the print production area, with easy access and free
from any obstruction?
Have the two fire extinguishers been fitted in the prescribed locations in the print
production and storage areas? Is the print production fire extinguisher rated for
electrical fire?
Have strategic locations been allocated for the fixture and display of the
appropriate safety warning signs?
Does the area meet the Restricted Access Location requirements in the zone
surrounding the printer?
(Required)
Do the users who operate the printer have appropriate technical training and
experience necessary to be aware of the hazards to which they may be exposed in
performing a task and to take appropriate measures to minimize the risks?
(Required)
Will printer operations be supervised at all times?
(Required)
Does the room meet the minimal ventilation (ACHs) standard required by local
regulations and/or HP requirements?
(Required)
30
Chapter 4
Checklist
ENWW