HP Latex 3600 Site Preparation Guide - Page 38

Has the HP Scitex Caldera Grand RIP software v10 L5E74A been ordered, and is

Page 38 highlights

Electrical configuration Yes No Do you need an Uninterrupted Power Supply (UPS)? If so, is it correctly installed? No power cords are supplied with the printer; does the electrician understand that power cord(s) must be provided according to printer specifications and local laws? If local regulations specify that you must use electrical plugs to connect the printer to the power supply, does the electrician have the required plugs ready for installation? Networking requirements Have network connections been supplied? Do you have a LAN cable long enough to connect the printer to the network? Do you have an Internet connection? Yes No Equipment preparation Is the air compressor or pressurized air line ready for the day installation? Have the correct supplies been ordered for deliver on or before the date of the printer's installation? Minimum requirements: 1 set of ink cartridges. Recommended: 1 set of ink cartridges, an extra set of ink cartridges, correct substrate for training purposes. Yes No RIP requirements Has the HP Scitex ONYX Thrive 211 RIP Software (D9Z41A) been ordered, and is the computer to be used available with the required specifications? Has the HP Scitex Caldera Grand RIP software v10 (L5E74A) been ordered, and is the computer to be used available with the required specifications? If neither of the HP Scitex RIPs is to be used, is there a computer available with a RIP application installed that supports the printer? Do you have a spectrophotometer that is compatible with the RIP? Yes No Environmental requirements Have the temperature and humidity requirements been satisfactorily met in the print production area, and is there adequate ventilation or air conditioning? Have the temperature and humidity requirements been satisfactorily met in the storage area? Is the print production area free from dirt and dust? Yes No 34 Chapter 4 Checklist Comments Comments Comments Comments Comments ENWW

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39

Electrical configuration
Yes
No
Comments
Do you need an Uninterrupted Power Supply (UPS)? If so, is it correctly installed?
No power cords are supplied with the printer; does the electrician understand that
power cord(s) must be provided according to printer specifications and local laws?
If local regulations specify that you must use electrical plugs to connect the printer
to the power supply, does the electrician have the required plugs ready for
installation?
Networking requirements
Yes
No
Comments
Have network connections been supplied?
Do you have a LAN cable long enough to connect the printer to the network?
Do you have an Internet connection?
Equipment preparation
Yes
No
Comments
Is the air compressor or pressurized air line ready for the day installation?
Have the correct supplies been ordered for deliver on or before the date of the
printer's installation?
Minimum requirements
: 1 set of ink cartridges.
Recommended
: 1 set of ink cartridges, an extra set of ink cartridges, correct
substrate for training purposes.
RIP requirements
Yes
No
Comments
Has the HP Scitex ONYX Thrive 211 RIP Software (D9Z41A) been ordered, and is
the computer to be used available with the required specifications?
Has the HP Scitex Caldera Grand RIP software v10 (L5E74A) been ordered, and is
the computer to be used available with the required specifications?
If neither of the HP Scitex RIPs is to be used, is there a computer available with a
RIP application installed that supports the printer?
Do you have a spectrophotometer that is compatible with the RIP?
Environmental requirements
Yes
No
Comments
Have the temperature and humidity requirements been satisfactorily met in the
print production area, and is there adequate ventilation or air conditioning?
Have the temperature and humidity requirements been satisfactorily met in the
storage area?
Is the print production area free from dirt and dust?
34
Chapter 4
Checklist
ENWW