HP R1500 HP UPS R5000 Installation Instructions - Page 3
UPS kit contents, Tools and materials, Selecting a site, Readying the equipment
View all HP R1500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 3 highlights
UPS kit contents • This document • Documentation CD • HP Infrastructure Management Pack CD To download the latest software version, see the HP website (http://www.hp.com/go/rackandpower). IMPORTANT: Do not install the existing HP Management Module software. Only install the HP Power Protector software required for this unit. • Warranty information • Rails, with mounting hardware for square- and round-holed racks • UPS • Battery modules, preinstalled • Front bezel • HP UPS Network Module, preinstalled • REPO port and connector block • Cord retention clips • DB-9 to RJ-45 configuration cable • Computer interface cable • Jumper cords for load equipment power • Rear mounting brackets, plates, and associated hardware • Front mounting ears and associated hardware Tools and materials The following tools are required for installation: • Phillips screwdriver • 10-mm hex-nut driver The following items are supplied with the rack: • Screws • Hex nuts • Clip nuts Selecting a site WARNING: To prevent fire or electric shock, install the unit in a temperature- and humidity-controlled indoor environment, free of conductive contaminants. When selecting a site, consider the following factors: • Elevated operating ambient temperature-If the equipment is installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment might be greater than room ambient temperature. Install the equipment in an environment compatible with the operating temperature. • Reduced air flow-In the rack, the rate of air flow required for safe operation of the equipment must not be compromised. • Circuit overloading-Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern. • Reliable earthing-Reliable earthing of rack-mounted equipment should be maintained. Particular attention should be given to supply connections other than direct connections to the branch circuit, such as the use of power strips. • Electrical requirements-All models require a dedicated (unshared) branch circuit, suitably rated for the specific UPS as stated in "Input specifications" in the user guide. Readying the equipment 1. Check the battery recharge date specified on the label that is affixed to the shipping carton. IMPORTANT: Do not use the battery if the recharge date has passed. If the date on the battery recharge date label has passed without the battery being recharged, contact an HP authorized service representative for directions. 2. Transport the packaged unit to its installation location. 3. Unpack the equipment near the rack where the unit will be assembled. CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install the heaviest item first, and continue to populate the rack from the bottom to the top. Installing the mounting rails WARNING: To reduce the risk of personal injury or damage to the equipment, be sure that: • The leveling feet are extended to the floor. • The full weight of the rack rests on the leveling feet. • The stabilizing feet are attached to the rack if it is a single-rack installation. • The racks are coupled together in multiple-rack installations. • Only one component is extended at a time. A rack may become unstable if more than one component is extended for any reason. NOTE: Mounting hardware for square- and round-holed racks is included in the UPS kit.