HP Superdome SX2000 Installation Guide, Sixth Edition - HP Integrity Superdome - Page 5

List of s - chassis

Page 5 highlights

List of Figures 1-1 Normal Tilt Indicator...15 1-2 Abnormal Tilt Indicator ...16 1-3 Front of Cabinet Container...18 1-4 Cutting the Polystrap Bands...18 1-5 Removing the Ramps from the Pallet 19 1-6 Power Supply Mounting Screws Location 20 1-7 I/O Chassis Mounting Screws...20 1-8 Shipping Strap Location...22 1-9 Removing the Mounting Brackets 23 1-10 Positioning the Ramps...24 1-11 Rolling the Cabinet Down the Ramp 24 1-12 Blower Housing Frame...26 1-13 Removing Protective Cardboard from the Housing 27 1-14 Installing the Rear Blower Housing 27 1-15 Installing the Front Blower Housing 28 1-16 Installing the Blowers...29 1-17 Attaching the Rear Side Skin...30 1-18 Attaching the Front Side Skins...31 1-19 Attaching the Side Bezels...32 1-20 Attaching the Leveling Feet...33 1-21 Installing the Lower Front Door Assembly 34 1-22 Installing the Upper Front Door Assembly 35 1-23 Installing the Rear Blower Bezel...36 1-24 Installing the Front Blower Bezel 37 1-25 PDCA Assembly for Options 6 and 7 39 1-26 A 4-Wire Connector...39 1-27 A 5-Wire Connector...40 1-28 Installing the PDCA...40 1-29 Checking PDCA Test Points (5-Wire 41 1-30 Wall Receptacle Pinouts...42 1-31 Power Supply Indicator LED...43 1-32 Removing Front EMI Panel Screw 44 1-33 Removing the Back EMI Panel...44 1-34 Cable Labeling...45 1-35 Routing I/O Cables...46 1-36 Front Panel with HKP and Present LEDs 51 1-37 BPS LEDs...52 1-38 MP LAN Connection Location...53 1-39 LAN Configuration Screen...54 1-40 The ls Command Screen...55 1-41 Logging In...56 1-42 Main MP Menu...56 1-43 MP Command Option...57 1-44 MP Virtual Front Panel...57 1-45 Example of Partition State-Cabinet Not Powered Up 57 1-46 MP Console Option...58 1-47 HP Integrity Superdome/sx2000 EFI Boot Manager 59 1-48 EFI Shell Prompt...59 1-49 HP Integrity Superdome/sx2000 Partitions at System Firmware Console 60 1-50 Power Status First Window...61 1-51 Power Status Window...61 1-52 Power Status Showing State of UGUY LEDs 62 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

List of Figures
1-1
Normal Tilt Indicator
....................................................................................................................
15
1-2
Abnormal Tilt Indicator
................................................................................................................
16
1-3
Front of Cabinet Container
............................................................................................................
18
1-4
Cutting the Polystrap Bands
..........................................................................................................
18
1-5
Removing the Ramps from the Pallet
............................................................................................
19
1-6
Power Supply Mounting Screws Location
....................................................................................
20
1-7
I/O Chassis Mounting Screws
.......................................................................................................
20
1-8
Shipping Strap Location
................................................................................................................
22
1-9
Removing the Mounting Brackets
.................................................................................................
23
1-10
Positioning the Ramps
...................................................................................................................
24
1-11
Rolling the Cabinet Down the Ramp
............................................................................................
24
1-12
Blower Housing Frame
..................................................................................................................
26
1-13
Removing Protective Cardboard from the Housing
.....................................................................
27
1-14
Installing the Rear Blower Housing
..............................................................................................
27
1-15
Installing the Front Blower Housing
.............................................................................................
28
1-16
Installing the Blowers
....................................................................................................................
29
1-17
Attaching the Rear Side Skin
.........................................................................................................
30
1-18
Attaching the Front Side Skins
......................................................................................................
31
1-19
Attaching the Side Bezels
..............................................................................................................
32
1-20
Attaching the Leveling Feet
...........................................................................................................
33
1-21
Installing the Lower Front Door Assembly
...................................................................................
34
1-22
Installing the Upper Front Door Assembly
...................................................................................
35
1-23
Installing the Rear Blower Bezel
....................................................................................................
36
1-24
Installing the Front Blower Bezel
..................................................................................................
37
1-25
PDCA Assembly for Options 6 and 7
............................................................................................
39
1-26
A 4-Wire Connector
.......................................................................................................................
39
1-27
A 5-Wire Connector
.......................................................................................................................
40
1-28
Installing the PDCA
.......................................................................................................................
40
1-29
Checking PDCA Test Points (5-Wire)
............................................................................................
41
1-30
Wall Receptacle Pinouts
................................................................................................................
42
1-31
Power Supply Indicator LED
........................................................................................................
43
1-32
Removing Front EMI Panel Screw
................................................................................................
44
1-33
Removing the Back EMI Panel
......................................................................................................
44
1-34
Cable Labeling
...............................................................................................................................
45
1-35
Routing I/O Cables
........................................................................................................................
46
1-36
Front Panel with HKP and Present LEDs
......................................................................................
51
1-37
BPS LEDs
.......................................................................................................................................
52
1-38
MP LAN Connection Location
......................................................................................................
53
1-39
LAN Configuration Screen
............................................................................................................
54
1-40
The ls Command Screen
................................................................................................................
55
1-41
Logging In
.....................................................................................................................................
56
1-42
Main MP Menu
..............................................................................................................................
56
1-43
MP Command Option
...................................................................................................................
57
1-44
MP Virtual Front Panel
..................................................................................................................
57
1-45
Example of Partition State—Cabinet Not Powered Up
.................................................................
57
1-46
MP Console Option
.......................................................................................................................
58
1-47
HP Integrity Superdome/sx2000 EFI Boot Manager
.....................................................................
59
1-48
EFI Shell Prompt
............................................................................................................................
59
1-49
HP Integrity Superdome/sx2000 Partitions at System Firmware Console
....................................
60
1-50
Power Status First Window
...........................................................................................................
61
1-51
Power Status Window
...................................................................................................................
61
1-52
Power Status Showing State of UGUY LEDs
...............................................................................
62
5