HP Superdome SX2000 Installation Guide, Sixth Edition - HP Integrity Superdome - Page 68

Support Management Station, AC1 Present

Page 68 highlights

port 0, 54 port 1, 54 status, 54 LED AC0 Present, 52 AC1 Present, 52 HKP (housekeeping), 50 Present, 50 leveling feet attaching, 33 M MAC address, 54 moving the system, 26 MP displaying the customer LAN parameters, 54 exiting the main menu, 55 invoking a partition console, 58 invoking the virtual front panel, 57 physical connection to the customer LAN, 52 returning to the main menu, 55 setting the customer LAN parameters, 54 viewing the virtual front panel screen, 57 P packing carton contents, 14 PDCA 4-wire voltage verification, 38 5-wire voltage verification, 38 ac breakers, 50 installation, 40 unpacking, 25 wiring configurations, 25, 40 post installation check, 66 power housekeeping, 50 power supply mounting screws, 20 power up power on sequence for cabinets, 58 R ramp extensions, 19 repackaging checklist, 25 returning equipment, 25 routing I/O cables, 45 S signoff, customer, 66 site of installation, 26 site preparation verification, 14 skins, attaching, 29 subnet mask, 54 Support Management Station private LAN IP address, 53 private LAN port designations, 54 T tilt indicator description, 15 68 Index shown in diagram, 16 U unpacking blower housings, 26 blowers, 26 pallet ramps, 19 PDCA, 25 system cabinet, 17 W wrist strap usage, 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

port 0, 54
port 1, 54
status, 54
LED
AC0 Present, 52
AC1 Present, 52
HKP (housekeeping), 50
Present, 50
leveling feet
attaching, 33
M
MAC address, 54
moving the system, 26
MP
displaying the customer LAN parameters, 54
exiting the main menu, 55
invoking a partition console, 58
invoking the virtual front panel, 57
physical connection to the customer LAN, 52
returning to the main menu, 55
setting the customer LAN parameters, 54
viewing the virtual front panel screen, 57
P
packing carton contents, 14
PDCA
4-wire voltage verification, 38
5-wire voltage verification, 38
ac breakers, 50
installation, 40
unpacking, 25
wiring configurations, 25, 40
post installation check, 66
power
housekeeping, 50
power supply mounting screws, 20
power up
power on sequence for cabinets, 58
R
ramp extensions, 19
repackaging checklist, 25
returning equipment, 25
routing I/O cables, 45
S
signoff, customer, 66
site of installation, 26
site preparation verification, 14
skins, attaching, 29
subnet mask, 54
Support Management Station
private LAN IP address, 53
private LAN port designations, 54
T
tilt indicator
description, 15
shown in diagram, 16
U
unpacking
blower housings, 26
blowers, 26
pallet ramps, 19
PDCA, 25
system cabinet, 17
W
wrist strap usage, 13
68
Index