HP rp3440 Site Preparation Guide, Fifth Edition - HP 9000 rp3410/rp3440 - Page 40

Cooling, Storage, Training, Please check either Yes or No. If No, include comment# or date

Page 40 highlights

General Site Preparation Guidelines Sample Site Inspection Checklist Table 2-5 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment# or date 26. Are there any equipment servicing hazards (loose ground wires, poor lighting, and so on)? Cooling No. Area or condition Yes No 27. Can cooling be maintained between 20°C and 55°C (up to 5,000 ft.)? Derate 1°C/1,000 ft. above 5,000 ft. and up to 10,000 ft. 28. Can temperature changes be held to 10°C per hour with tape media? Can temperature changes be held to 20°C per hour without tape media? 29. Can humidity level be maintained at 40% to 60% at 35°C noncondensing? 30. Are air conditioning filters installed and clean? Storage No. Area or condition Yes No 31. Are cabinets available for tape and disc media? 32. Is shelving available for documentation? Training No. Area or Condition 33. Are personnel enrolled in the System Administrator's Course? 34. Is on-site training required? Comment or Date 40 Chapter 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47

General Site Preparation Guidelines
Sample Site Inspection Checklist
Chapter 2
40
26.
Are there any equipment servicing hazards
(loose ground wires, poor lighting, and so on)?
Cooling
No.
Area or condition
Yes
No
27.
Can cooling be maintained between 20
°
C and 55
°
C (up to
5,000 ft.)? Derate 1
°
C/1,000 ft. above 5,000 ft. and up to
10,000 ft.
28.
Can temperature changes be held to
10
°
C per hour with
tape media? Can temperature changes be held to 20
°
C per
hour without tape media?
29.
Can humidity level be maintained at 40% to 60% at 35
°
C
noncondensing?
30.
Are air conditioning filters installed and clean?
Storage
No.
Area or condition
Yes
No
31.
Are cabinets available for tape and disc media?
32.
Is shelving available for documentation?
Training
No.
Area or Condition
33.
Are personnel enrolled in the System Administrator’s
Course?
34.
Is on-site training required?
Table 2-5
Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date
Comment or Date