Hitachi CPX265 Network Functions - Page 17

Schedule Setting Continued - specifications

Page 17 highlights

Settings Schedule Setting (Continued) Item Specific date No1 Schedule Month/Day Schedule List Specific date No.2 Schedule Month/Day Schedule List Specific date No.3 Schedule Month/Day Schedule List Specific date No.4 Schedule Month/Day Schedule List Specific date No.5 Schedule Month/Day Schedule List Description Configures the specific date (No.1) schedule. Click the [Enable] check box to enable specific date (No.1) scheduling. Configures the Month and date. Displays the current specific date (No.1) schedule. Configures the specific date (No.2) schedule. Click the [Enable] check box to enable specific date (No.2) scheduling. Configures the Month and date. Displays the current specific date (No.2) schedule. Configures the specific date (No.3) schedule. Click the [Enable] check box to enable specific date (No.3) scheduling. Configures the Month and date. Displays the current specific date (No.3) schedule. Configures the specific date (No.4) schedule. Click the [Enable] check box to enable specific date (No.4) scheduling. Configures the Month and date. Displays the current specific date (No.4) schedule. Configures the specific date (No.5) schedule. Click the [Enable] check box to enable specific date (No.5) scheduling. Set the Month and date. Displays the current specific date (No.5) schedule. Click the [Apply] button to save the settings. 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38

±³
Settings
Schedule Setting (Continued)
Item
Description
Specific date No1
Configures the specific date (No.1) schedule.
Schedule
Click the
[Enable]
check box to enable specific date (No.1)
scheduling.
Month/Day
Configures the Month and date.
Schedule List
Displays the current specific date (No.1) schedule.
Specific date No.2
Configures the specific date (No.2) schedule.
Click the
[Apply]
button to save the settings.
Schedule
Click the
[Enable]
check box to enable specific date (No.2)
scheduling.
Month/Day
Configures the Month and date.
Schedule List
Displays the current specific date (No.2) schedule.
Specific date No.3
Configures the specific date (No.3) schedule.
Schedule
Click the
[Enable]
check box to enable specific date (No.3)
scheduling.
Month/Day
Configures the Month and date.
Schedule List
Displays the current specific date (No.3) schedule.
Specific date No.4
Configures the specific date (No.4) schedule.
Schedule
Click the
[Enable]
check box to enable specific date (No.4)
scheduling.
Month/Day
Configures the Month and date.
Schedule List
Displays the current specific date (No.4) schedule.
Specific date No.5
Configures the specific date (No.5) schedule.
Schedule
Click the
[Enable]
check box to enable specific date (No.5)
scheduling.
Month/Day
Set the Month and date.
Schedule List
Displays the current specific date (No.5) schedule.