Honeywell NX4L1 Installation Guide - Page 63
Maintenance
View all Honeywell NX4L1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 63 highlights
NetAXS™ NX4L1 Installation Maintenance Note: Maintain at least a .25-inch distance between the non-power limited wiring (115 VAC/60 Hz input wiring, power line filter wiring, 24 VDC wiring, battery backup/charger wiring, and battery-to-battery wiring) and all other wiring, which is power-limited Class 2 wiring. 8.0 Maintenance Perform the following maintenance on the NetAXS™ enclosure: • Change the CASIL CA1270 lead-acid backup batteries (HAS part number 3-000066) every two to two-and-a-half years. Caution: Do not connect an uncharged battery to the panel. • Oil the lock once per year • Use the following procedure to change the 3.5 A, 250 V, Bussman type AGC fuse in the AL600ULXB Power Supply module. See Figure 1 on page 6 to identify the location of the Power Supply's fuse and the four mounting screws that secure the protective Power Supply cover. Warning: Be sure to disconnect the AC power before removing the Power Supply cover. Warning: To reduce the risk of fire, replace the fuse only with a 3.5 A, 250 V, Bussman type AGC fuse. 1.Disconnect the AC power. 2.Remove the protective Power Supply cover by removing the four mounting screws (see Figure 1 on page 6). 3.Remove the translucent fuse cover. 4.Replace the fuse with a new 3.5 A, 250 V fuse. 5.Re-attach the translucent fuse cover. 6.Re-attach the protective Power Supply cover with the four mounting screws. 7.Re-connect the AC power. NetAXS Access Control Unit NX4L1 Installation Guide, Document 7-901099, Revision A 53