Husqvarna ST131 Owners Manual - Page 5

ASSEMBLY, Setup - parts

Page 5 highlights

ASSEMBLY Setup Loose Parts Use the chart below to verify that all parts have been shipped. Procedure 1. 2. 3. Description No parts required Carriage bolts Flange nuts Washers Knob Chute Deflector Screw 4. No parts required Qty. Use - Unfold the handle. 5 Install the discharge chute. 4 Install the discharge chute. 2 Install the discharge chute. 1 Install the discharge chute. 1 Install the discharge chute. 1 Install the discharge chute. 4 Install the upper handle cover. - Filling the engine with oil 1. Unfolding the Handle Procedure 1. Lift operator handle up to the desired height, and close adjustment lever ensuring the positioning pin on the lower handle engages one of the three holes on the upper handle (Figure 2). 2. Pull up and push down slightly on the handle to verify handle is locked into place (Figure 3). NOTE: If handle feels unsecure with the adjustment levers closed, tighten adjustment handle nuts until the handle feels secure. 3. Remove the cardboard from recoil start handle and feed the recoil rope through the rope guide. 1 1 2 4 2 3 Figure 2 1. Handle 2. Handle adjustment lever 3. Positioning pin 4. Upper handle adjustment hole 2 3 Figure 3 1. Recoil handle 2. Rope guide 3. Adjustment lever nut 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

5
ASSEMBLY
Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1.
No parts required
Unfold the handle.
2.
Carriage bolts
Flange nuts
Washers
Knob
Chute
Deflector
5
4
2
1
1
1
Install the discharge chute.
Install the discharge chute.
Install the discharge chute.
Install the discharge chute.
Install the discharge chute.
Install the discharge chute.
3.
Screw
4
Install the upper handle cover.
4.
No parts required
Filling the engine with oil
1. Handle
2. Handle adjustment lever
3. Positioning pin
4. Upper handle adjustment hole
Figure 2
1. Unfolding the Handle
Procedure
1.
Lift operator handle up to the desired height, and close
adjustment lever ensuring the positioning pin on the
lower handle engages one of the three holes on the
upper handle (Figure 2).
Figure 3
2.
Pull up and push down slightly on the handle to verify
handle is locked into place (Figure 3).
NOTE:
If handle feels unsecure with the adjustment
levers closed, tighten adjustment handle nuts until the
handle feels secure.
3.
Remove the cardboard from recoil start handle and
feed the recoil rope through the rope guide.
1. Recoil handle
2. Rope guide
3. Adjustment lever nut
1
3
4
2
2
3
2
1