Intel R2000LH2/LT2 Service Guide - Page 25
Hardware Installations and Upgrades
View all Intel R2000LH2/LT2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 25 highlights
Hardware Installations and Upgrades 2 Hardware Installations and Upgrades Before You Begin Before working with your server product, pay close attention to the Safety Information at the beginning of this manual. Note: Whenever you service the system, you must first power down the server and unplug all peripheral devices and the AC power cord. Tools and Supplies Needed Phillips* (cross head) screwdriver (#1 bit and #2 bit) Needle nosed pliers Anti-static wrist strap and conductive foam pad (recommended) System Reference All references to left, right, front, top, and bottom assume the reader is facing the front of the chassis as it would be positioned for normal operation. Note: The Intel® Server System R2304LH2 is shown for illustration purposes in this document. Cable Routing When you add or remove components from your server system, make sure your cables are routed correctly before reinstalling the server system cover. Use caution to make sure no cables or wires are pinched and that the airflow from the fans is not blocked. Use the figures below to determine the correct cable routing. Note: Red lines are for power connection, dot lines are for optional device connection. For system with 4 x 3.5" hot swap hard drive bay Note: 1. To activate the port SCU1 (4-7) on the server board, a proper Intel® RAID C600 Upgrade Key must be installed. For instructions, see Intel® RAID C600 Upgrade Key Installation Guide. 2. A second SSD is supported when the optical drive is NOT in use. Intel® Server System R2000LH2/LT2 Service Guide 13