Intel SE7500WV2 Product Guide - Page 17

Assembling the System, Before You Begin, Supplies Needed - memory

Page 17 highlights

2 Assembling the System Before the SR2300 can be installed for use, you must assemble the hardware components that make up your particular system. Additionally, you will want to add any peripherals and add-in cards purchased for the system. The following procedures help guide you through this assembly process and create your desired system configuration. ✏ NOTE To maintain and ensure regulation compliance, the fully integrated system should be tested, certified and/or documented to illustrate compliance to the regional regulations and laws for where the product will be sold. The peripherals and add-in cards chosen for integration should have individual regulatory approvals. Before You Begin Supplies Needed Before beginning your work, make sure you have the following supplies available: • Anti-static wrist strap (recommended) • SR2300 accessory kit (included) • SE7500WV2 SCSI server board kit • Processors and memory you purchased separately to add to the server board • Optional peripherals and add-in cards you want to include in the system 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88

17
2 Assembling the System
Before the SR2300 can be installed for use, you must assemble the hardware components that make
up your particular system.
Additionally, you will want to add any peripherals and add-in cards
purchased for the system.
The following procedures help guide you through this assembly process
and create your desired system configuration.
NOTE
To maintain and ensure regulation compliance, the fully integrated system
should be tested, certified and/or documented to illustrate compliance to
the regional regulations and laws for where the product will be sold.
The
peripherals and add-in cards chosen for integration should have individual
regulatory approvals.
Before You Begin
Supplies Needed
Before beginning your work, make sure you have the following supplies available:
Anti-static wrist strap (recommended)
SR2300 accessory kit (included)
SE7500WV2 SCSI server board kit
Processors and memory you purchased separately to add to the server board
Optional peripherals and add-in cards you want to include in the system