Intel SE7520AF2 User Guide - Page 22
Hardware Installations and Upgrades, Before You Begin, Tools and Supplies Needed - manual
View all Intel SE7520AF2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 22 highlights
Hardware Installations and Upgrades 2 Hardware Installations and Upgrades Before You Begin Before working with your server product, pay close attention to the "Safety Information" at the beginning of this manual. Tools and Supplies Needed Phillips* (cross head) screwdriver (#1 bit and #2 bit) Needle nosed pliers A ruler Pen or pencil Antistatic wrist strap and conductive foam pad (recommended) Installing and Removing Memory The silkscreen on the board for the DIMMs displays DIMM1B, DIMM1A, DIMM2B, DIMM2A, DIMM3B, DIMM3A, DIMM4B, DIMM4A, starting from the edge of the board. DIMM4A is the socket closest to the center of the board. See "System Memory" for a discussion of the memory requirements and options, and Tested Memory List for a list of tested DIMMs. Intel® Server Board SE7520AF2 User Guide 11