Intel STL2 Quick Start Guide - Page 19

Rearrange the Standoffs, SC5000 Server Chassis.

Page 19 highlights

Rearrange the Standoffs Your chassis may have metal standoffs already installed. You must rearrange them so they match the holes in the server board. Failure to properly rearrange the metal standoffs may cause the server board to malfunction and may permanently damage the server board. The following illustration shows the Intel® SC5000 Server Chassis. The standoffs in the chassis must be installed in screw holes 1, 4, 5, 6, 7, 13, 17, 18, 19. The hole numbers are stamped in the chassis sheet metal. Make sure the two positioning standoffs are in holes 17 and 19. You chassis may be different from the illustration. 1 = 4 = 5 7 17 18 6 13 Intel Server Board STL2 Quick Start Guide 19 OM10675 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

Intel Server Board STL2 Quick Start Guide
19
Rearrange the Standoffs
Your chassis may have metal standoffs already installed.
You must rearrange
them so they match the holes in the server board.
Failure to properly rearrange
the metal standoffs may cause the server board to malfunction and may
permanently damage the server board.
The following illustration shows the Intel
®
SC5000 Server Chassis.
The
standoffs in the chassis must be installed in screw holes 1, 4, 5, 6, 7, 13, 17,
18, 19.
The hole numbers are stamped in the chassis sheet metal.
Make sure the
two positioning standoffs are in holes 17 and 19.
You chassis may be different
from the illustration.
OM10675
1
7
17
6
13
19
4
5
18
=
=