LG LWHD1800HR Service Manual - Page 21
Equipment needed, A-Pulling Vacuum, B-Charging
View all LG LWHD1800HR manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 21 highlights
Disassembly Equipment needed: Vacuum pump, Charging cylinder, Manifold gauge, Brazing equipment. Pin-off tool capable of making a leak-proof seal, Leak detector, Tubing cutter, Hand Tools to remove components, Service valve. CONDENSER (HIGH PRESSURE SIDE) COMPOUND GAUGE MANIFOLD GAUGE B A CAPILLARY TUBE SEE INSETS BELOW EVAPORATOR (LOW PRESSURE SIDE) COMPRESSOR A B EXTERNAL VACUUM PUMP Figure 31A-Pulling Vacuum 21 Room Air Conditioner LOW HI B A CHARGING CYLINDER C Figure 31B-Charging
21
Room Air Conditioner
Disassembly
Equipment needed:
Vacuum pump, Charging cylinder,
Manifold gauge, Brazing equipment. Pin-off tool capable
of making a leak-proof seal, Leak detector, Tubing cutter, Hand Tools to remove components, Service valve.
A
COMPOUND GAUGE
EVAPORATOR
(LOW PRESSURE SIDE)
COMPRESSOR
CAPILLARY TUBE
CONDENSER
(HIGH PRESSURE SIDE)
SEE INSETS
BELOW
MANIFOLD
GAUGE
B
Figure 31A-Pulling Vacuum
Figure 31B-Charging
A
B
EXTERNAL
VACUUM PUMP
A
CHARGING
CYLINDER
LOW
HI
B
C