LG MHEC1737F INSTALLATION - Page 6

Parts, Tools and Materials

Page 6 highlights

us_main.book.book Page 6 Thursday, November 25, 2021 10:15 AM 6 INSTALLATION Parts Included Parts NOTE • Depending on your ventilation requirements, you may not use all of these parts. Tools and Materials You will need the following tools and materials for the installation: a Power cord clamp bushing (1ea): for the cord hole in a metal upper cabinet b 1/4" x 2" lag screw (2ea): for wall stud holes c 1/4" x 3" toggle bolts (2ea): for drywall holes d Spring toggle heads (2ea): for the toggle bolts e 1/4" x 3" bolts (2ea): for securing to the upper cabinet f Tapping screws (2ea): for attaching the damper duct connector g Power cord clamp (1ea) and dark-colored mounting screw (1ea): to hold the power cord h Back-draft damper: 2 pieces must be assembled as shown. (for roof venting or wall venting installation, not for room venting installation) i Upper cabinet template (1ea) j Rear wall template (1ea) NOTE • You need to install at least two lag screws into a 2" x 4" stud and four anchor bolts into the wall. The mounting area must meet the 150 lb. weight requirement. a Phillips screwdriver (for the screws) b Flat blade screwdriver (for the toggle bolts) c Small side cutters (nipper) or tin snips d Measuring tape (metal preferred) e Stud finder f Plumb line g Pencil h Clear tape (for taping the templates to the wall) i Saber saw (for cutting vent holes for roof or wall venting) j Electric drill k 3/8" and 3/4" wood drill bits l 1/2" and 3/16" drill bits m Keyhole saw (for the power cord hole) n Duct tape o Caulking gun and caulk NOTE • If you have brick or masonry walls, you will need special hardware and tools.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

6
INSTALLATION
Parts
Included Parts
NOTE
Depending on your ventilation requirements,
you may not use all of these parts.
a
Power cord clamp bushing (1ea): for the cord
hole in a metal upper cabinet
b
1/4" x 2" lag screw (2ea): for wall stud holes
c
1/4" x 3" toggle bolts (2ea): for drywall holes
d
Spring toggle heads (2ea): for the toggle bolts
e
1/4" x 3" bolts (2ea): for securing to the upper
cabinet
f
Tapping screws (2ea): for attaching the damper
duct connector
g
Power cord clamp (1ea) and dark-colored
mounting screw (1ea): to hold the power cord
h
Back-draft damper: 2 pieces must be
assembled as shown. (for roof venting or wall
venting installation, not for room venting
installation)
i
Upper cabinet template (1ea)
j
Rear wall template (1ea)
NOTE
You need to install at least two lag screws into a
2" x 4" stud and four anchor bolts into the wall.
The mounting area must meet the 150 lb. weight
requirement.
Tools and Materials
You will need the following tools and materials for
the installation:
a
Phillips screwdriver (for the screws)
b
Flat blade screwdriver (for the toggle bolts)
c
Small side cutters (nipper) or tin snips
d
Measuring tape (metal preferred)
e
Stud finder
f
Plumb line
g
Pencil
h
Clear tape (for taping the templates to the wall)
i
Saber saw (for cutting vent holes for roof or
wall venting)
j
Electric drill
k
3/8" and 3/4" wood drill bits
l
1/2" and 3/16" drill bits
m
Keyhole saw (for the power cord hole)
n
Duct tape
o
Caulking gun and caulk
NOTE
If you have brick or masonry walls, you will need
special hardware and tools.
us_main.book.book
Page 6
Thursday, November 25, 2021
10:15 AM