Netgear FS752TPS FS752TS Hardware manual - Page 16
Installation, Preparing the Site
View all Netgear FS752TPS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
Chapter 2 Installation This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch installation involves the following steps: "Preparing the Site" "Installing the Switch" "Checking the Installation" "Connecting Devices to the Switch" "Installing an SFP GBIC Module" "Installing Device as Stand-alone or Stack Master" "Applying AC Power" "Managing the Switch using a Web Browser or the PC Utility for Initial Configuration" Preparing the Site Before installing the switch, ensure the operating environment meets the requirements in the following table. Table 2-1. Site Requirements Characteristics Requirements Mounting Access • Desktop installations - Provide a flat table or shelf surface. • Rack-mount installations - Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically secure. The rack-mount kit supplied with the switch is also required. Locate the switch in a position that allows access to the front panel RJ-45 ports, the ability to view the front panel LEDs, and easy safe access access to the power connector. v1.0, September 2007 2-29