Netgear FSM7226RS FSM7226RS / FSM7250RS Hardware Installation Guide - Page 17
Hardware Installation, Package Contents
UPC - 606449059915
View all Netgear FSM7226RS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
Chapter 2 Hardware Installation This chapter explains how to install the hardware for the Managed Stackable Layer 2+ Fast Ethernet Switch models FSM7226RS and FSM7250RS. Package Contents Each switch is packed and shipped separately. The package contains the following items: • Managed Stackable Layer 2+ Fast Ethernet Switch with preinstalled software • Power adapter cord • Rubber footpads for tabletop installation • Rubber caps for the SFP sockets • Rack-mounting kit • Stack cable • Null-modem serial cable (RS-232) with 9-pin connectors • Resource CD: The CD contains - Configuration software - Documentation including the Command Line Interface Reference for the ProSafe 7200RS Series Layer-2 Stackable Switches, the NETGEAR 7000 Series Managed Switch Administration Guide, the NETGEAR Installation Guide for the 7000 Series Stackable Managed Switch, and this Hardware Installation Guide • Warranty and Support Card • ProSafe NMS100 Network Management System 30-day trial CD-ROM 2-1 v1.0, October 2008